BER-48 CR 33A
Carrying BER-48 CR 33A over TARHE RUN
1 M E OF JCT US 22, Fairfield, Ohio
Data updated May 2026
FHWA NBI record, refreshed with each annual release.
Bridge Snapshot: BER-48 CR 33A
The BER-48 CR 33A bridge in Fairfield, Ohio carries BER-48 CR 33A over TARHE RUN. It was built in 1959, making it 67 years old today. It was last reconstructed in 2003, extending its service life. The structure is built primarily of steel and spans 2 sections, stretching 6.7 meters (22 feet) end to end. Daily traffic averages 12,643 vehicles, placing it in the heavily-trafficked tier of Ohio bridges. It is owned and maintained by County Highway Agency.
The latest FHWA inspection records show culvert at 8/9. The weakest component sits in good condition. None of this bridge's reported major components fall into the Poor condition range. Its NBI inventory load rating is 68.0 metric tons.
Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.
How BER-48 CR 33A compares
Live comparison across Ohio.
Historical Sufficiency Rating
PlainBridge-computedFHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.
Condition Ratings
Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.
Structural Details
- Year Built
- 1959
- Last Reconstructed
- 2003
- Material
- Steel
- Number of Spans
- 2
- Structure Length
- 6.7 m (22 ft)
- Owner
- County Highway Agency
- Avg Daily Traffic
- 12,643 vehicles/day
- Structure Number
- 2335735
Location
Data Source
FHWA National Bridge Inventory (NBI).
FHWA NBI Program ↗How to read this record
This page shows what the last federal inspection recorded, not whether BER-48 CR 33A is safe to cross today. Here is how to use it.
- NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
- Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
- Compare BER-48 CR 33A against other structures in Fairfield and across Ohio. Ohio bridges
- Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge
Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.
Frequently Asked Questions
What do the condition ratings mean for BER-48 CR 33A?
BER-48 CR 33A in Fairfield, Ohio on the FHWA's 0–9 scale.
How often is BER-48 CR 33A inspected?
BER-48 CR 33A's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 12,643 vehicles per day.
What does “structurally deficient” mean in older bridge reports?
FHWA retired that reported status beginning with the 2018 archive. BER-48 CR 33A is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.
What is the inventory load rating for BER-48 CR 33A?
BER-48 CR 33A has an NBI inventory load rating of 68.0 metric tons.
Who is responsible for maintaining BER-48 CR 33A?
BER-48 CR 33A is owned and maintained by County Highway Agency.
How old is BER-48 CR 33A and does age affect safety?
BER-48 CR 33A was built in 1959, making it 67 years old and last reconstructed in 2003.
Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.
Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.