FHWA NBI 2024 Inspection record Public-domain dataset

MAD-01 CROOK RD SW

Carrying MAD-01 CROOK RD SW over ARNEY RUN (CROOKS RD SW)

0.2 MI S OF MEISTER RD SW, Fairfield, Ohio

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Good
49 t Inventory load rating

Bridge Snapshot: MAD-01 CROOK RD SW

The MAD-01 CROOK RD SW bridge in Fairfield, Ohio carries MAD-01 CROOK RD SW over ARNEY RUN (CROOKS RD SW). It was built in 1992, making it 34 years old today. The structure is built primarily of concrete continuous and spans 3 sections, stretching 28.7 meters (94 feet) end to end. Daily traffic averages 96 vehicles, placing it in the lower-traffic tier of Ohio bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 8/9, superstructure at 8/9, substructure at 7/9. The weakest component sits in good condition. No reported major component scores in the Poor range under the current federal condition thresholds. Its NBI inventory load rating is 48.6 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How MAD-01 CROOK RD SW compares

▲ 11.1
Load rating vs Ohio average (37.5 t)
Top 18%
Higher load rating than 82% of Ohio bridges
320
Bridges in Fairfield · 16 in Poor condition
MAD-01 CROOK RD SW 48.6 t
Ohio average 37.5 t

Live comparison across Ohio.

Historical Sufficiency Rating

PlainBridge-computed
99.0 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
29.0
Essentiality /15
15.0
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
8/9
Good (7–9)
Superstructure
8/9
Good (7–9)
Substructure
7/9
Good (7–9)
Inventory Load Rating
48.6 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1992
Material
Concrete Continuous
Number of Spans
3
Structure Length
28.7 m (94 ft)
Deck Width
6.7 m (22 ft)
Owner
County Highway Agency
Avg Daily Traffic
96 vehicles/day
Structure Number
2336669

Condition Analysis

  • The deck (driving surface) is in good condition (8/9), showing no significant deterioration.
  • The superstructure (beams and supports above the deck) is in good condition (8/9), showing no significant deterioration.
  • At 7/9, the substructure (piers and abutments) is in good shape and shows no significant wear.

How to read this record

This page shows what the last federal inspection recorded, not whether MAD-01 CROOK RD SW is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare MAD-01 CROOK RD SW against other structures in Fairfield and across Ohio. Ohio bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for MAD-01 CROOK RD SW?

MAD-01 CROOK RD SW in Fairfield, Ohio has a deck rating of 8/9, superstructure rating of 8/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is MAD-01 CROOK RD SW inspected?

MAD-01 CROOK RD SW's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 96 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. MAD-01 CROOK RD SW is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for MAD-01 CROOK RD SW?

MAD-01 CROOK RD SW has an NBI inventory load rating of 48.6 metric tons.

Who is responsible for maintaining MAD-01 CROOK RD SW?

MAD-01 CROOK RD SW is owned and maintained by County Highway Agency.

How old is MAD-01 CROOK RD SW and does age affect safety?

MAD-01 CROOK RD SW was built in 1992, making it 34 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.