FHWA NBI 2024 Inspection record Public-domain dataset

BOMBARDIER TRAIL

Carrying BOMBARDIER TRAIL over WALNUT CR

S 30 T 61 N R 16 W, Adair, Missouri

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
24 t Inventory load rating

Bridge Snapshot: BOMBARDIER TRAIL

The BOMBARDIER TRAIL bridge in Adair, Missouri carries BOMBARDIER TRAIL over WALNUT CR. It was built in 1991, making it 35 years old today. The structure is built primarily of steel and spans 3 sections, stretching 26.5 meters (87 feet) end to end. Daily traffic averages 5 vehicles, placing it in the lower-traffic tier of Missouri bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 7/9, substructure at 6/9. The weakest component sits in fair condition. No reported major component scores in the Poor range under the current federal condition thresholds. Its NBI inventory load rating is 24.3 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How BOMBARDIER TRAIL compares

▼ 9.4
Load rating vs Missouri average (33.7 t)
Bottom 30%
Lower load rating than 70% of Missouri bridges
301
Bridges in Adair · 20 in Poor condition
BOMBARDIER TRAIL 24.3 t
Missouri average 33.7 t

Live comparison across Missouri.

Historical Sufficiency Rating

PlainBridge-computed
76.3 / 100 - historical 50–79.9 band
Structural adequacy /55
47.5
Serviceability /30
18.5
Essentiality /15
15.0
Special reductions
−4.7

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
24.3 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1991
Material
Steel
Number of Spans
3
Structure Length
26.5 m (87 ft)
Deck Width
4.9 m (16 ft)
Owner
County Highway Agency
Avg Daily Traffic
5 vehicles/day
Structure Number
23377

Condition Analysis

  • At 7/9, the deck (driving surface) is in good shape and shows no significant wear.
  • The superstructure (beams and supports above the deck) rates good at 7/9, with no significant deterioration on file.
  • At 6/9, the substructure (piers and abutments) shows fair condition, with minor wear flagged for upkeep.

How to read this record

This page shows what the last federal inspection recorded, not whether BOMBARDIER TRAIL is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare BOMBARDIER TRAIL against other structures in Adair and across Missouri. Missouri bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for BOMBARDIER TRAIL?

BOMBARDIER TRAIL in Adair, Missouri has a deck rating of 7/9, superstructure rating of 7/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is BOMBARDIER TRAIL inspected?

BOMBARDIER TRAIL's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 5 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. BOMBARDIER TRAIL is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for BOMBARDIER TRAIL?

BOMBARDIER TRAIL has an NBI inventory load rating of 24.3 metric tons.

Who is responsible for maintaining BOMBARDIER TRAIL?

BOMBARDIER TRAIL is owned and maintained by County Highway Agency.

How old is BOMBARDIER TRAIL and does age affect safety?

BOMBARDIER TRAIL was built in 1991, making it 35 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.