FHWA NBI 2024 Inspection record Public-domain dataset

CORDELIA ROAD

Carrying CORDELIA ROAD over LEDGEWOOD CREEK

0.3 MI SW JCT W/PENN AV, Solano, California

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
32 t Inventory load rating

Bridge Snapshot: CORDELIA ROAD

The CORDELIA ROAD bridge in Solano, California carries CORDELIA ROAD over LEDGEWOOD CREEK. It was built in 1989, making it 37 years old today. The structure is built primarily of concrete continuous and spans 5 sections, stretching 50.3 meters (165 feet) end to end. Daily traffic averages 3,540 vehicles, placing it in the moderately-trafficked tier of California bridges. It is owned and maintained by City/Municipal Highway Agency.

The latest FHWA inspection records show a deck rating of 5/9, superstructure at 5/9, substructure at 7/9. The weakest component sits in fair condition. All reported major components score above the Poor range. Its NBI inventory load rating is 32.4 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How CORDELIA ROAD compares

▲ 1.1
Load rating vs California average (31.3 t)
Bottom 41%
Lower load rating than 59% of California bridges
383
Bridges in Solano · 14 in Poor condition
CORDELIA ROAD 32.4 t
California average 31.3 t

Live comparison across California.

Historical Sufficiency Rating

PlainBridge-computed
85.0 / 100 - historical 80–100 band
Structural adequacy /55
45.0
Serviceability /30
27.0
Essentiality /15
14.0
Special reductions
−1.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
5/9
Fair (5–6)
Superstructure
5/9
Fair (5–6)
Substructure
7/9
Good (7–9)
Inventory Load Rating
32.4 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1989
Material
Concrete Continuous
Number of Spans
5
Structure Length
50.3 m (165 ft)
Deck Width
12.3 m (40 ft)
Owner
City/Municipal Highway Agency
Avg Daily Traffic
3,540 vehicles/day
Structure Number
23C0080

Condition Analysis

  • The deck (driving surface) is in fair condition (5/9), with minor deterioration that may require routine maintenance.
  • The superstructure (beams and supports above the deck) is in fair condition (5/9), with minor deterioration that may require routine maintenance.
  • At 7/9, the substructure (piers and abutments) is in good shape and shows no significant wear.

How to read this record

This page shows what the last federal inspection recorded, not whether CORDELIA ROAD is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare CORDELIA ROAD against other structures in Solano and across California. California bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for CORDELIA ROAD?

CORDELIA ROAD in Solano, California has a deck rating of 5/9, superstructure rating of 5/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is CORDELIA ROAD inspected?

CORDELIA ROAD's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 3,540 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. CORDELIA ROAD is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for CORDELIA ROAD?

CORDELIA ROAD has an NBI inventory load rating of 32.4 metric tons.

Who is responsible for maintaining CORDELIA ROAD?

CORDELIA ROAD is owned and maintained by City/Municipal Highway Agency.

How old is CORDELIA ROAD and does age affect safety?

CORDELIA ROAD was built in 1989, making it 37 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.