CENTER PARKWAY
Carrying CENTER PARKWAY over UNION HOUSE CREEK
JUST N OF COSUMNES BLVD, Sacramento, California
Data updated May 2026
FHWA NBI record, refreshed with each annual release.
Bridge Snapshot: CENTER PARKWAY
The CENTER PARKWAY bridge in Sacramento, California carries CENTER PARKWAY over UNION HOUSE CREEK. It was built in 1975, making it 51 years old today. It was last reconstructed in 1993, extending its service life. The structure is built primarily of concrete continuous and spans 4 sections, stretching 20.3 meters (67 feet) end to end. Daily traffic averages 13,295 vehicles, placing it in the heavily-trafficked tier of California bridges. It is owned and maintained by City/Municipal Highway Agency.
The latest FHWA inspection records show a deck rating of 4/9, superstructure at 4/9, substructure at 7/9. The weakest component sits in poor condition. A component scored 4 or below, placing this bridge in the federal Poor condition category rather than declaring it unsafe or closed. Its NBI inventory load rating is 34.0 metric tons.
Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.
How CENTER PARKWAY compares
Live comparison across California.
Historical Sufficiency Rating
PlainBridge-computedFHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.
Condition Ratings
Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.
Structural Details
- Year Built
- 1975
- Last Reconstructed
- 1993
- Material
- Concrete Continuous
- Number of Spans
- 4
- Structure Length
- 20.3 m (67 ft)
- Deck Width
- 28.9 m (95 ft)
- Owner
- City/Municipal Highway Agency
- Avg Daily Traffic
- 13,295 vehicles/day
- Structure Number
- 24C0299
Location
Data Source
FHWA National Bridge Inventory (NBI).
FHWA NBI Program ↗Condition Analysis
- • At 4/9, the deck (driving surface) is in poor shape, with advanced wear flagged for priority repair.
- • At 4/9, the superstructure (beams and supports above the deck) is in poor shape, with advanced wear flagged for priority repair.
- • The substructure (piers and abutments) is in good condition (7/9), showing no significant deterioration.
How to read this record
CENTER PARKWAY is in the federal Poor condition category. That is a component-based result, not a closure order.
- NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
- Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
- Compare CENTER PARKWAY against other structures in Sacramento and across California. California bridges
- Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge
Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.
Frequently Asked Questions
What do the condition ratings mean for CENTER PARKWAY?
CENTER PARKWAY in Sacramento, California has a deck rating of 4/9, superstructure rating of 4/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.
How often is CENTER PARKWAY inspected?
CENTER PARKWAY's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 13,295 vehicles per day.
What does “structurally deficient” mean in older bridge reports?
FHWA retired that reported status beginning with the 2018 archive. CENTER PARKWAY is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.
What is the inventory load rating for CENTER PARKWAY?
CENTER PARKWAY has an NBI inventory load rating of 34.0 metric tons.
Who is responsible for maintaining CENTER PARKWAY?
CENTER PARKWAY is owned and maintained by City/Municipal Highway Agency.
How old is CENTER PARKWAY and does age affect safety?
CENTER PARKWAY was built in 1975, making it 51 years old and last reconstructed in 1993.
Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.
Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.