FHWA NBI 2024 Inspection record Public-domain dataset

CHOUTEAU TFWY

Carrying CHOUTEAU TFWY over RR YARD

S 10 T 50 N R 33 W, Jackson, Missouri

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Good
31 t Inventory load rating

Bridge Snapshot: CHOUTEAU TFWY

The CHOUTEAU TFWY bridge in Jackson, Missouri carries CHOUTEAU TFWY over RR YARD. It was built in 1952, making it 74 years old today. The structure is built primarily of steel continuous and spans 4 sections, stretching 89.9 meters (295 feet) end to end. Daily traffic averages 9,054 vehicles, placing it in the moderately-trafficked tier of Missouri bridges. It is owned and maintained by City/Municipal Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 7/9, substructure at 7/9. The weakest component sits in good condition. No reported major component scores in the Poor range under the current federal condition thresholds. Its NBI inventory load rating is 30.6 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How CHOUTEAU TFWY compares

▼ 3.1
Load rating vs Missouri average (33.7 t)
Bottom 42%
Lower load rating than 58% of Missouri bridges
930
Bridges in Jackson · 43 in Poor condition
CHOUTEAU TFWY 30.6 t
Missouri average 33.7 t

Live comparison across Missouri.

Historical Sufficiency Rating

PlainBridge-computed
76.5 / 100 - historical 50–79.9 band
Structural adequacy /55
54.2
Serviceability /30
9.0
Essentiality /15
13.3
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
7/9
Good (7–9)
Inventory Load Rating
30.6 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1952
Material
Steel Continuous
Number of Spans
4
Structure Length
89.9 m (295 ft)
Deck Width
15.8 m (52 ft)
Owner
City/Municipal Highway Agency
Avg Daily Traffic
9,054 vehicles/day
Structure Number
25381

Condition Analysis

  • The deck (driving surface) is in good condition (7/9), showing no significant deterioration.
  • At 7/9, the superstructure (beams and supports above the deck) is in good shape and shows no significant wear.
  • The substructure (piers and abutments) rates good at 7/9, with no significant deterioration on file.

How to read this record

This page shows what the last federal inspection recorded, not whether CHOUTEAU TFWY is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare CHOUTEAU TFWY against other structures in Jackson and across Missouri. Missouri bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for CHOUTEAU TFWY?

CHOUTEAU TFWY in Jackson, Missouri has a deck rating of 7/9, superstructure rating of 7/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is CHOUTEAU TFWY inspected?

CHOUTEAU TFWY's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 9,054 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. CHOUTEAU TFWY is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for CHOUTEAU TFWY?

CHOUTEAU TFWY has an NBI inventory load rating of 30.6 metric tons.

Who is responsible for maintaining CHOUTEAU TFWY?

CHOUTEAU TFWY is owned and maintained by City/Municipal Highway Agency.

How old is CHOUTEAU TFWY and does age affect safety?

CHOUTEAU TFWY was built in 1952, making it 74 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.