FHWA NBI 2024 Inspection record Public-domain dataset

C116 RED BARN LN

Carrying C116 RED BARN LN over POISON SLOUGH

011 MI US 20, Harney, Oregon

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
18 t Inventory load rating

Bridge Snapshot: C116 RED BARN LN

The C116 RED BARN LN bridge in Harney, Oregon carries C116 RED BARN LN over POISON SLOUGH. It was built in 1969, making it 57 years old today. The structure is built primarily of wood or timber and spans 2 sections, stretching 9.8 meters (32 feet) end to end. Daily traffic averages 248 vehicles, placing it in the lower-traffic tier of Oregon bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 6/9, substructure at 5/9. The weakest component sits in fair condition. All reported major components score above the Poor range. Its NBI inventory load rating is 17.5 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How C116 RED BARN LN compares

▼ 14.8
Load rating vs Oregon average (32.3 t)
Bottom 13%
Lower load rating than 87% of Oregon bridges
130
Bridges in Harney · 3 in Poor condition
C116 RED BARN LN 17.5 t
Oregon average 32.3 t

Live comparison across Oregon.

Historical Sufficiency Rating

PlainBridge-computed
51.9 / 100 - historical 50–79.9 band
Structural adequacy /55
26.3
Serviceability /30
13.8
Essentiality /15
14.9
Special reductions
−3.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
6/9
Fair (5–6)
Substructure
5/9
Fair (5–6)
Inventory Load Rating
17.5 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1969
Material
Wood or Timber
Number of Spans
2
Structure Length
9.8 m (32 ft)
Deck Width
7.5 m (25 ft)
Owner
County Highway Agency
Avg Daily Traffic
248 vehicles/day
Structure Number
25A54 C11600106

Condition Analysis

  • The deck (driving surface) is in fair condition (6/9), with minor deterioration that may require routine maintenance.
  • The superstructure (beams and supports above the deck) rates fair at 6/9, minor deterioration that routine maintenance should address.
  • The substructure (piers and abutments) is in fair condition (5/9), with minor deterioration that may require routine maintenance.

How to read this record

This page shows what the last federal inspection recorded, not whether C116 RED BARN LN is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare C116 RED BARN LN against other structures in Harney and across Oregon. Oregon bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for C116 RED BARN LN?

C116 RED BARN LN in Harney, Oregon has a deck rating of 6/9, superstructure rating of 6/9, and substructure rating of 5/9 on the FHWA's 0–9 scale.

How often is C116 RED BARN LN inspected?

C116 RED BARN LN's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 248 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. C116 RED BARN LN is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for C116 RED BARN LN?

C116 RED BARN LN has an NBI inventory load rating of 17.5 metric tons.

Who is responsible for maintaining C116 RED BARN LN?

C116 RED BARN LN is owned and maintained by County Highway Agency.

How old is C116 RED BARN LN and does age affect safety?

C116 RED BARN LN was built in 1969, making it 57 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.