FHWA NBI 2024 Inspection record Public-domain dataset

SE HARNEY ST

Carrying SE HARNEY ST over B-57 OVER JOHNSON CREEK

S E HARNEY ST NR S E 45TH, Multnomah, Oregon

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
21 t Inventory load rating

Bridge Snapshot: SE HARNEY ST

The SE HARNEY ST bridge in Multnomah, Oregon carries SE HARNEY ST over B-57 OVER JOHNSON CREEK. It was built in 1948, making it 78 years old today. It was last reconstructed in 1976, extending its service life. The structure is built primarily of steel and spans 1 section, stretching 13.4 meters (44 feet) end to end. Daily traffic averages 137 vehicles, placing it in the lower-traffic tier of Oregon bridges. It is owned and maintained by City/Municipal Highway Agency.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 6/9, substructure at 6/9. The weakest component sits in fair condition. No reported major component scores in the Poor range under the current federal condition thresholds. Its NBI inventory load rating is 20.7 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How SE HARNEY ST compares

▼ 11.6
Load rating vs Oregon average (32.3 t)
Bottom 22%
Lower load rating than 78% of Oregon bridges
474
Bridges in Multnomah · 12 in Poor condition
SE HARNEY ST 20.7 t
Oregon average 32.3 t

Live comparison across Oregon.

Historical Sufficiency Rating

PlainBridge-computed
57.9 / 100 - historical 50–79.9 band
Structural adequacy /55
42.0
Serviceability /30
11.0
Essentiality /15
12.9
Special reductions
−8.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
6/9
Fair (5–6)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
20.7 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1948
Last Reconstructed
1976
Material
Steel
Number of Spans
1
Structure Length
13.4 m (44 ft)
Deck Width
3.7 m (12 ft)
Owner
City/Municipal Highway Agency
Avg Daily Traffic
137 vehicles/day
Structure Number
25B57 000

Condition Analysis

  • The deck (driving surface) is in fair condition (6/9), with minor deterioration that may require routine maintenance.
  • The superstructure (beams and supports above the deck) rates fair at 6/9, minor deterioration that routine maintenance should address.
  • At 6/9, the substructure (piers and abutments) shows fair condition, with minor wear flagged for upkeep.

How to read this record

This page shows what the last federal inspection recorded, not whether SE HARNEY ST is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare SE HARNEY ST against other structures in Multnomah and across Oregon. Oregon bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for SE HARNEY ST?

SE HARNEY ST in Multnomah, Oregon has a deck rating of 6/9, superstructure rating of 6/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is SE HARNEY ST inspected?

SE HARNEY ST's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 137 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. SE HARNEY ST is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for SE HARNEY ST?

SE HARNEY ST has an NBI inventory load rating of 20.7 metric tons.

Who is responsible for maintaining SE HARNEY ST?

SE HARNEY ST is owned and maintained by City/Municipal Highway Agency.

How old is SE HARNEY ST and does age affect safety?

SE HARNEY ST was built in 1948, making it 78 years old and last reconstructed in 1976.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.