FHWA NBI 2024 Inspection record Public-domain dataset

C308 CLARK LANE

Carrying C308 CLARK LANE over MALHEUR RIVER

020 MI VAN DREWSEY RD 306, Harney, Oregon

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
39 t Inventory load rating

Bridge Snapshot: C308 CLARK LANE

The C308 CLARK LANE bridge in Harney, Oregon carries C308 CLARK LANE over MALHEUR RIVER. It was built in 1979, making it 47 years old today. The structure is built primarily of prestressed concrete and spans 1 section, stretching 21.9 meters (72 feet) end to end. Daily traffic averages 85 vehicles, placing it in the lower-traffic tier of Oregon bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 6/9, substructure at 7/9. The weakest component sits in fair condition. None of this bridge's reported major components fall into the Poor condition range. Its NBI inventory load rating is 39.0 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How C308 CLARK LANE compares

▲ 6.7
Load rating vs Oregon average (32.3 t)
Top 29%
Higher load rating than 71% of Oregon bridges
130
Bridges in Harney · 3 in Poor condition
C308 CLARK LANE 39.0 t
Oregon average 32.3 t

Live comparison across Oregon.

Historical Sufficiency Rating

PlainBridge-computed
92.0 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
25.0
Essentiality /15
15.0
Special reductions
−3.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
6/9
Fair (5–6)
Substructure
7/9
Good (7–9)
Inventory Load Rating
39.0 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1979
Material
Prestressed Concrete
Number of Spans
1
Structure Length
21.9 m (72 ft)
Deck Width
8.5 m (28 ft)
Owner
County Highway Agency
Avg Daily Traffic
85 vehicles/day
Structure Number
25E15 C30800198

Condition Analysis

  • The deck (driving surface) rates fair at 6/9, minor deterioration that routine maintenance should address.
  • The superstructure (beams and supports above the deck) rates fair at 6/9, minor deterioration that routine maintenance should address.
  • The substructure (piers and abutments) is in good condition (7/9), showing no significant deterioration.

How to read this record

This page shows what the last federal inspection recorded, not whether C308 CLARK LANE is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare C308 CLARK LANE against other structures in Harney and across Oregon. Oregon bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for C308 CLARK LANE?

C308 CLARK LANE in Harney, Oregon has a deck rating of 6/9, superstructure rating of 6/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is C308 CLARK LANE inspected?

C308 CLARK LANE's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 85 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. C308 CLARK LANE is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for C308 CLARK LANE?

C308 CLARK LANE has an NBI inventory load rating of 39.0 metric tons.

Who is responsible for maintaining C308 CLARK LANE?

C308 CLARK LANE is owned and maintained by County Highway Agency.

How old is C308 CLARK LANE and does age affect safety?

C308 CLARK LANE was built in 1979, making it 47 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.