FHWA NBI 2024 Inspection record Public-domain dataset

CR 1050 E

Carrying CR 1050 E over SMITH FORK

00.80 N OF CR 900 S, Gibson, Indiana

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Poor
48 t Inventory load rating

Bridge Snapshot: CR 1050 E

The CR 1050 E bridge in Gibson, Indiana carries CR 1050 E over SMITH FORK. It was built in 1992, making it 34 years old today. The structure is built primarily of steel continuous and spans 2 sections, stretching 21.5 meters (71 feet) end to end. Daily traffic averages 20 vehicles, placing it in the lower-traffic tier of Indiana bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 5/9, substructure at 4/9. The weakest component sits in poor condition. At least one major component here scores 4 or below, which produces a Poor condition classification under FHWA's current reporting rules. Its NBI inventory load rating is 47.5 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How CR 1050 E compares

▲ 11.9
Load rating vs Indiana average (35.6 t)
Top 12%
Higher load rating than 88% of Indiana bridges
348
Bridges in Gibson · 15 in Poor condition
CR 1050 E 47.5 t
Indiana average 35.6 t

Live comparison across Indiana.

Historical Sufficiency Rating

PlainBridge-computed
66.0 / 100 - historical 50–79.9 band
Structural adequacy /55
30.0
Serviceability /30
24.0
Essentiality /15
15.0
Special reductions
−3.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
5/9
Fair (5–6)
Substructure
4/9
Poor (1–4)
Inventory Load Rating
47.5 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1992
Material
Steel Continuous
Number of Spans
2
Structure Length
21.5 m (71 ft)
Deck Width
6.1 m (20 ft)
Owner
County Highway Agency
Avg Daily Traffic
20 vehicles/day
Structure Number
2600205

Condition Analysis

  • At 6/9, the deck (driving surface) shows fair condition, with minor wear flagged for upkeep.
  • At 5/9, the superstructure (beams and supports above the deck) shows fair condition, with minor wear flagged for upkeep.
  • At 4/9, the substructure (piers and abutments) is in poor shape, with advanced wear flagged for priority repair.

How to read this record

CR 1050 E is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare CR 1050 E against other structures in Gibson and across Indiana. Indiana bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for CR 1050 E?

CR 1050 E in Gibson, Indiana has a deck rating of 6/9, superstructure rating of 5/9, and substructure rating of 4/9 on the FHWA's 0–9 scale.

How often is CR 1050 E inspected?

CR 1050 E's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 20 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. CR 1050 E is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for CR 1050 E?

CR 1050 E has an NBI inventory load rating of 47.5 metric tons.

Who is responsible for maintaining CR 1050 E?

CR 1050 E is owned and maintained by County Highway Agency.

How old is CR 1050 E and does age affect safety?

CR 1050 E was built in 1992, making it 34 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.