FHWA NBI 2024 Inspection record Public-domain dataset

PICCARDO LANE

Carrying PICCARDO LANE over NORTH FORK JACKSON CREEK

200 FT WEST OF N. MAIN ST, Amador, California

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
16 t Inventory load rating

Bridge Snapshot: PICCARDO LANE

The PICCARDO LANE bridge in Amador, California carries PICCARDO LANE over NORTH FORK JACKSON CREEK. It was built in 1925, making it 101 years old today. The structure is built primarily of concrete continuous and spans 2 sections, stretching 7.5 meters (25 feet) end to end. Daily traffic averages 30 vehicles, placing it in the lower-traffic tier of California bridges. It is owned and maintained by City/Municipal Highway Agency.

The latest FHWA inspection records show a deck rating of 5/9, superstructure at 5/9, substructure at 5/9. The weakest component sits in fair condition. All reported major components score above the Poor range. Its NBI inventory load rating is 16.2 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How PICCARDO LANE compares

▼ 15.1
Load rating vs California average (31.3 t)
Bottom 5%
Lower load rating than 95% of California bridges
62
Bridges in Amador · 15 in Poor condition
PICCARDO LANE 16.2 t
California average 31.3 t

Live comparison across California.

Historical Sufficiency Rating

PlainBridge-computed
47.1 / 100 - historical 20–49.9 band
Structural adequacy /55
23.8
Serviceability /30
9.0
Essentiality /15
14.3
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
5/9
Fair (5–6)
Superstructure
5/9
Fair (5–6)
Substructure
5/9
Fair (5–6)
Inventory Load Rating
16.2 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1925
Material
Concrete Continuous
Number of Spans
2
Structure Length
7.5 m (25 ft)
Deck Width
3.4 m (11 ft)
Owner
City/Municipal Highway Agency
Avg Daily Traffic
30 vehicles/day
Structure Number
26C0037

Condition Analysis

  • The deck (driving surface) rates fair at 5/9, minor deterioration that routine maintenance should address.
  • At 5/9, the superstructure (beams and supports above the deck) shows fair condition, with minor wear flagged for upkeep.
  • The substructure (piers and abutments) rates fair at 5/9, minor deterioration that routine maintenance should address.

How to read this record

This page shows what the last federal inspection recorded, not whether PICCARDO LANE is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare PICCARDO LANE against other structures in Amador and across California. California bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for PICCARDO LANE?

PICCARDO LANE in Amador, California has a deck rating of 5/9, superstructure rating of 5/9, and substructure rating of 5/9 on the FHWA's 0–9 scale.

How often is PICCARDO LANE inspected?

PICCARDO LANE's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 30 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. PICCARDO LANE is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for PICCARDO LANE?

PICCARDO LANE has an NBI inventory load rating of 16.2 metric tons.

Who is responsible for maintaining PICCARDO LANE?

PICCARDO LANE is owned and maintained by City/Municipal Highway Agency.

How old is PICCARDO LANE and does age affect safety?

PICCARDO LANE was built in 1925, making it 101 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.