FHWA NBI 2024 Inspection record Public-domain dataset

BU 60 E

Carrying BU 60 E over PALMER SLU

S 2 T 24 N R 6 E, Butler, Missouri

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
36 t Inventory load rating

Bridge Snapshot: BU 60 E

The BU 60 E bridge in Butler, Missouri carries BU 60 E over PALMER SLU. It was built in 1975, making it 51 years old today. It was last reconstructed in 1986, extending its service life. The structure is built primarily of concrete continuous and spans 13 sections, stretching 108.2 meters (355 feet) end to end. Daily traffic averages 10,501 vehicles, placing it in the heavily-trafficked tier of Missouri bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 6/9, substructure at 7/9. The weakest component sits in fair condition. No reported major component scores in the Poor range under the current federal condition thresholds. Its NBI inventory load rating is 36.0 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How BU 60 E compares

▲ 2.3
Load rating vs Missouri average (33.7 t)
Top 39%
Higher load rating than 61% of Missouri bridges
227
Bridges in Butler · 18 in Poor condition
BU 60 E 36.0 t
Missouri average 33.7 t

Live comparison across Missouri.

Historical Sufficiency Rating

PlainBridge-computed
76.7 / 100 - historical 50–79.9 band
Structural adequacy /55
55.0
Serviceability /30
23.7
Essentiality /15
0.0
Special reductions
−2.1

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
6/9
Fair (5–6)
Substructure
7/9
Good (7–9)
Inventory Load Rating
36.0 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1975
Last Reconstructed
1986
Material
Concrete Continuous
Number of Spans
13
Structure Length
108.2 m (355 ft)
Deck Width
20.1 m (66 ft)
Owner
State Highway Agency
Avg Daily Traffic
10,501 vehicles/day
Structure Number
2764

Condition Analysis

  • At 6/9, the deck (driving surface) shows fair condition, with minor wear flagged for upkeep.
  • The superstructure (beams and supports above the deck) rates fair at 6/9, minor deterioration that routine maintenance should address.
  • The substructure (piers and abutments) is in good condition (7/9), showing no significant deterioration.

How to read this record

This page shows what the last federal inspection recorded, not whether BU 60 E is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare BU 60 E against other structures in Butler and across Missouri. Missouri bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for BU 60 E?

BU 60 E in Butler, Missouri has a deck rating of 6/9, superstructure rating of 6/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is BU 60 E inspected?

BU 60 E's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 10,501 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. BU 60 E is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for BU 60 E?

BU 60 E has an NBI inventory load rating of 36.0 metric tons.

Who is responsible for maintaining BU 60 E?

BU 60 E is owned and maintained by State Highway Agency.

How old is BU 60 E and does age affect safety?

BU 60 E was built in 1975, making it 51 years old and last reconstructed in 1986.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.