FHWA NBI 2024 Inspection record Public-domain dataset

BANCROFT ROAD

Carrying BANCROFT ROAD over CONTRA COSTA CANAL

0.2 MI S TREAT BLVD, Contra Costa, California

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Good
32 t Inventory load rating

Bridge Snapshot: BANCROFT ROAD

The BANCROFT ROAD bridge in Contra Costa, California carries BANCROFT ROAD over CONTRA COSTA CANAL. It was built in 1968, making it 58 years old today. It was last reconstructed in 1976, extending its service life. The structure is built primarily of prestressed concrete and spans 1 section, stretching 8.1 meters (27 feet) end to end. Daily traffic averages 29,800 vehicles, placing it in the heavily-trafficked tier of California bridges. It is owned and maintained by City/Municipal Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 7/9, substructure at 7/9. The weakest component sits in good condition. No reported major component scores in the Poor range under the current federal condition thresholds. Its NBI inventory load rating is 32.4 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How BANCROFT ROAD compares

▲ 1.1
Load rating vs California average (31.3 t)
Bottom 41%
Lower load rating than 59% of California bridges
686
Bridges in Contra Costa · 38 in Poor condition
BANCROFT ROAD 32.4 t
California average 31.3 t

Live comparison across California.

Historical Sufficiency Rating

PlainBridge-computed
88.6 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
30.0
Essentiality /15
6.6
Special reductions
−3.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
7/9
Good (7–9)
Inventory Load Rating
32.4 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1968
Last Reconstructed
1976
Material
Prestressed Concrete
Number of Spans
1
Structure Length
8.1 m (27 ft)
Deck Width
28.7 m (94 ft)
Owner
City/Municipal Highway Agency
Avg Daily Traffic
29,800 vehicles/day
Structure Number
28C0344

Condition Analysis

  • The deck (driving surface) is in good condition (7/9), showing no significant deterioration.
  • At 7/9, the superstructure (beams and supports above the deck) is in good shape and shows no significant wear.
  • The substructure (piers and abutments) rates good at 7/9, with no significant deterioration on file.

How to read this record

This page shows what the last federal inspection recorded, not whether BANCROFT ROAD is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare BANCROFT ROAD against other structures in Contra Costa and across California. California bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for BANCROFT ROAD?

BANCROFT ROAD in Contra Costa, California has a deck rating of 7/9, superstructure rating of 7/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is BANCROFT ROAD inspected?

BANCROFT ROAD's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 29,800 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. BANCROFT ROAD is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for BANCROFT ROAD?

BANCROFT ROAD has an NBI inventory load rating of 32.4 metric tons.

Who is responsible for maintaining BANCROFT ROAD?

BANCROFT ROAD is owned and maintained by City/Municipal Highway Agency.

How old is BANCROFT ROAD and does age affect safety?

BANCROFT ROAD was built in 1968, making it 58 years old and last reconstructed in 1976.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.