FHWA NBI 2024 Inspection record Public-domain dataset

281ST ST EAST

Carrying 281ST ST EAST over CICERO CREEK

00.47 E OF SR 19, Hamilton, Indiana

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
22 t Inventory load rating

Bridge Snapshot: 281ST ST EAST

The 281ST ST EAST bridge in Hamilton, Indiana carries 281ST ST EAST over CICERO CREEK. It was built in 1979, making it 47 years old today. The structure is built primarily of prestressed concrete continuous and spans 3 sections, stretching 61.0 meters (200 feet) end to end. Daily traffic averages 910 vehicles, placing it in the lower-traffic tier of Indiana bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 7/9, substructure at 8/9. The weakest component sits in fair condition. No reported major component scores in the Poor range under the current federal condition thresholds. Its NBI inventory load rating is 22.0 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How 281ST ST EAST compares

▼ 13.6
Load rating vs Indiana average (35.6 t)
Bottom 8%
Lower load rating than 92% of Indiana bridges
440
Bridges in Hamilton · 11 in Poor condition
281ST ST EAST 22.0 t
Indiana average 35.6 t

Live comparison across Indiana.

Historical Sufficiency Rating

PlainBridge-computed
72.5 / 100 - historical 50–79.9 band
Structural adequacy /55
44.1
Serviceability /30
16.7
Essentiality /15
14.7
Special reductions
−3.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
7/9
Good (7–9)
Substructure
8/9
Good (7–9)
Inventory Load Rating
22.0 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1979
Material
Prestressed Concrete Continuous
Number of Spans
3
Structure Length
61.0 m (200 ft)
Deck Width
8.7 m (29 ft)
Owner
County Highway Agency
Avg Daily Traffic
910 vehicles/day
Structure Number
2900058

Condition Analysis

  • The deck (driving surface) is in fair condition (6/9), with minor deterioration that may require routine maintenance.
  • The superstructure (beams and supports above the deck) is in good condition (7/9), showing no significant deterioration.
  • At 8/9, the substructure (piers and abutments) is in good shape and shows no significant wear.

How to read this record

This page shows what the last federal inspection recorded, not whether 281ST ST EAST is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare 281ST ST EAST against other structures in Hamilton and across Indiana. Indiana bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for 281ST ST EAST?

281ST ST EAST in Hamilton, Indiana has a deck rating of 6/9, superstructure rating of 7/9, and substructure rating of 8/9 on the FHWA's 0–9 scale.

How often is 281ST ST EAST inspected?

281ST ST EAST's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 910 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. 281ST ST EAST is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for 281ST ST EAST?

281ST ST EAST has an NBI inventory load rating of 22.0 metric tons.

Who is responsible for maintaining 281ST ST EAST?

281ST ST EAST is owned and maintained by County Highway Agency.

How old is 281ST ST EAST and does age affect safety?

281ST ST EAST was built in 1979, making it 47 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.