FHWA NBI 2024 Inspection record Public-domain dataset

SOUTHEASTERN PKWY.

Carrying SOUTHEASTERN PKWY. over MUD CREEK

00.40 S OF E 136TH STREET, Hamilton, Indiana

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Good
39 t Inventory load rating

Bridge Snapshot: SOUTHEASTERN PKWY.

The SOUTHEASTERN PKWY. bridge in Hamilton, Indiana carries SOUTHEASTERN PKWY. over MUD CREEK. It was built in 2009, making it 17 years old today. The structure is built primarily of prestressed concrete and spans 1 section, stretching 26.4 meters (87 feet) end to end. Daily traffic averages 9,620 vehicles, placing it in the moderately-trafficked tier of Indiana bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 8/9, superstructure at 8/9, substructure at 8/9. The weakest component sits in good condition. All reported major components score above the Poor range. Its NBI inventory load rating is 38.6 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How SOUTHEASTERN PKWY. compares

▲ 3.0
Load rating vs Indiana average (35.6 t)
Top 29%
Higher load rating than 71% of Indiana bridges
440
Bridges in Hamilton · 11 in Poor condition
SOUTHEASTERN PKWY. 38.6 t
Indiana average 35.6 t

Live comparison across Indiana.

Historical Sufficiency Rating

PlainBridge-computed
95.2 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
28.0
Essentiality /15
12.2
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
8/9
Good (7–9)
Superstructure
8/9
Good (7–9)
Substructure
8/9
Good (7–9)
Inventory Load Rating
38.6 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
2009
Material
Prestressed Concrete
Number of Spans
1
Structure Length
26.4 m (87 ft)
Deck Width
12.1 m (40 ft)
Owner
County Highway Agency
Avg Daily Traffic
9,620 vehicles/day
Structure Number
2900455

Condition Analysis

  • The deck (driving surface) is in good condition (8/9), showing no significant deterioration.
  • At 8/9, the superstructure (beams and supports above the deck) is in good shape and shows no significant wear.
  • The substructure (piers and abutments) is in good condition (8/9), showing no significant deterioration.

How to read this record

This page shows what the last federal inspection recorded, not whether SOUTHEASTERN PKWY. is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare SOUTHEASTERN PKWY. against other structures in Hamilton and across Indiana. Indiana bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for SOUTHEASTERN PKWY.?

SOUTHEASTERN PKWY. in Hamilton, Indiana has a deck rating of 8/9, superstructure rating of 8/9, and substructure rating of 8/9 on the FHWA's 0–9 scale.

How often is SOUTHEASTERN PKWY. inspected?

SOUTHEASTERN PKWY.'s responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 9,620 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. SOUTHEASTERN PKWY. is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for SOUTHEASTERN PKWY.?

SOUTHEASTERN PKWY. has an NBI inventory load rating of 38.6 metric tons.

Who is responsible for maintaining SOUTHEASTERN PKWY.?

SOUTHEASTERN PKWY. is owned and maintained by County Highway Agency.

How old is SOUTHEASTERN PKWY. and does age affect safety?

SOUTHEASTERN PKWY. was built in 2009, making it 17 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.