FHWA NBI 2024 Inspection record Public-domain dataset

I-70 (SR-70).EBL

Carrying I-70 (SR-70).EBL over SOUTH SALT WASH

LONE TREE INTERCHG., Emery, Utah

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
30 t Inventory load rating

Bridge Snapshot: I-70 (SR-70).EBL

The I-70 (SR-70).EBL bridge in Emery, Utah carries I-70 (SR-70).EBL over SOUTH SALT WASH. It was built in 1965, making it 61 years old today. It was last reconstructed in 1989, extending its service life. The structure is built primarily of prestressed concrete and spans 2 sections, stretching 32.6 meters (107 feet) end to end. Daily traffic averages 4,957 vehicles, placing it in the moderately-trafficked tier of Utah bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 6/9, substructure at 7/9. The weakest component sits in fair condition. No reported major component scores in the Poor range under the current federal condition thresholds. Its NBI inventory load rating is 29.5 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How I-70 (SR-70).EBL compares

▼ 7.3
Load rating vs Utah average (36.8 t)
Bottom 37%
Lower load rating than 63% of Utah bridges
126
Bridges in Emery · 1 in Poor condition
I-70 (SR-70).EBL 29.5 t
Utah average 36.8 t

Live comparison across Utah.

Historical Sufficiency Rating

PlainBridge-computed
78.4 / 100 - historical 50–79.9 band
Structural adequacy /55
53.4
Serviceability /30
30.0
Essentiality /15
0.0
Special reductions
−5.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
6/9
Fair (5–6)
Substructure
7/9
Good (7–9)
Inventory Load Rating
29.5 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1965
Last Reconstructed
1989
Material
Prestressed Concrete
Number of Spans
2
Structure Length
32.6 m (107 ft)
Deck Width
16.8 m (55 ft)
Owner
State Highway Agency
Avg Daily Traffic
4,957 vehicles/day
Structure Number
2F 99

Condition Analysis

  • At 7/9, the deck (driving surface) is in good shape and shows no significant wear.
  • At 6/9, the superstructure (beams and supports above the deck) shows fair condition, with minor wear flagged for upkeep.
  • The substructure (piers and abutments) rates good at 7/9, with no significant deterioration on file.

How to read this record

This page shows what the last federal inspection recorded, not whether I-70 (SR-70).EBL is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare I-70 (SR-70).EBL against other structures in Emery and across Utah. Utah bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for I-70 (SR-70).EBL?

I-70 (SR-70).EBL in Emery, Utah has a deck rating of 7/9, superstructure rating of 6/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is I-70 (SR-70).EBL inspected?

I-70 (SR-70).EBL's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 4,957 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. I-70 (SR-70).EBL is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for I-70 (SR-70).EBL?

I-70 (SR-70).EBL has an NBI inventory load rating of 29.5 metric tons.

Who is responsible for maintaining I-70 (SR-70).EBL?

I-70 (SR-70).EBL is owned and maintained by State Highway Agency.

How old is I-70 (SR-70).EBL and does age affect safety?

I-70 (SR-70).EBL was built in 1965, making it 61 years old and last reconstructed in 1989.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.