FHWA NBI 2024 Inspection record Public-domain dataset

PARK AVE

Carrying PARK AVE over BRANDYWINE CREEK

00.25 W OF APPLE ST, Hancock, Indiana

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
33 t Inventory load rating

Bridge Snapshot: PARK AVE

The PARK AVE bridge in Hancock, Indiana carries PARK AVE over BRANDYWINE CREEK. It was built in 1994, making it 32 years old today. The structure is built primarily of prestressed concrete continuous and spans 3 sections, stretching 41.5 meters (136 feet) end to end. Daily traffic averages 12,770 vehicles, placing it in the heavily-trafficked tier of Indiana bridges. It is owned and maintained by City/Municipal Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 7/9, substructure at 6/9. The weakest component sits in fair condition. None of this bridge's reported major components fall into the Poor condition range. Its NBI inventory load rating is 32.7 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How PARK AVE compares

▼ 2.9
Load rating vs Indiana average (35.6 t)
Bottom 36%
Lower load rating than 64% of Indiana bridges
189
Bridges in Hancock
PARK AVE 32.7 t
Indiana average 35.6 t

Live comparison across Indiana.

Historical Sufficiency Rating

PlainBridge-computed
79.5 / 100 - historical 50–79.9 band
Structural adequacy /55
55.0
Serviceability /30
11.0
Essentiality /15
13.5
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
32.7 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1994
Material
Prestressed Concrete Continuous
Number of Spans
3
Structure Length
41.5 m (136 ft)
Deck Width
11.6 m (38 ft)
Owner
City/Municipal Highway Agency
Avg Daily Traffic
12,770 vehicles/day
Structure Number
3000690

Condition Analysis

  • The deck (driving surface) rates good at 7/9, with no significant deterioration on file.
  • The superstructure (beams and supports above the deck) rates good at 7/9, with no significant deterioration on file.
  • At 6/9, the substructure (piers and abutments) shows fair condition, with minor wear flagged for upkeep.

How to read this record

This page shows what the last federal inspection recorded, not whether PARK AVE is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare PARK AVE against other structures in Hancock and across Indiana. Indiana bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for PARK AVE?

PARK AVE in Hancock, Indiana has a deck rating of 7/9, superstructure rating of 7/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is PARK AVE inspected?

PARK AVE's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 12,770 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. PARK AVE is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for PARK AVE?

PARK AVE has an NBI inventory load rating of 32.7 metric tons.

Who is responsible for maintaining PARK AVE?

PARK AVE is owned and maintained by City/Municipal Highway Agency.

How old is PARK AVE and does age affect safety?

PARK AVE was built in 1994, making it 32 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.