FHWA NBI 2024 Inspection record Public-domain dataset

SOUTH BOUND I-77

Carrying SOUTH BOUND I-77 over IR 77 OVR LEATHERWOOD CK

.4 M S OF JCT US 40, Guernsey, Ohio

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Good
42 t Inventory load rating

Bridge Snapshot: SOUTH BOUND I-77

The SOUTH BOUND I-77 bridge in Guernsey, Ohio carries SOUTH BOUND I-77 over IR 77 OVR LEATHERWOOD CK. It was built in 1956, making it 70 years old today. It was last reconstructed in 2000, extending its service life. The structure is built primarily of steel continuous and spans 3 sections, stretching 44.5 meters (146 feet) end to end. Daily traffic averages 13,409 vehicles, placing it in the heavily-trafficked tier of Ohio bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 8/9, substructure at 8/9. The weakest component sits in good condition. None of this bridge's reported major components fall into the Poor condition range. Its NBI inventory load rating is 41.8 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How SOUTH BOUND I-77 compares

▲ 4.3
Load rating vs Ohio average (37.5 t)
Top 32%
Higher load rating than 68% of Ohio bridges
350
Bridges in Guernsey · 32 in Poor condition
SOUTH BOUND I-77 41.8 t
Ohio average 37.5 t

Live comparison across Ohio.

Historical Sufficiency Rating

PlainBridge-computed
91.7 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
25.0
Essentiality /15
11.7
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
8/9
Good (7–9)
Substructure
8/9
Good (7–9)
Inventory Load Rating
41.8 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1956
Last Reconstructed
2000
Material
Steel Continuous
Number of Spans
3
Structure Length
44.5 m (146 ft)
Deck Width
13.1 m (43 ft)
Owner
State Highway Agency
Avg Daily Traffic
13,409 vehicles/day
Structure Number
3003000

Condition Analysis

  • The deck (driving surface) rates good at 7/9, with no significant deterioration on file.
  • At 8/9, the superstructure (beams and supports above the deck) is in good shape and shows no significant wear.
  • At 8/9, the substructure (piers and abutments) is in good shape and shows no significant wear.

How to read this record

This page shows what the last federal inspection recorded, not whether SOUTH BOUND I-77 is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare SOUTH BOUND I-77 against other structures in Guernsey and across Ohio. Ohio bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for SOUTH BOUND I-77?

SOUTH BOUND I-77 in Guernsey, Ohio has a deck rating of 7/9, superstructure rating of 8/9, and substructure rating of 8/9 on the FHWA's 0–9 scale.

How often is SOUTH BOUND I-77 inspected?

SOUTH BOUND I-77's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 13,409 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. SOUTH BOUND I-77 is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for SOUTH BOUND I-77?

SOUTH BOUND I-77 has an NBI inventory load rating of 41.8 metric tons.

Who is responsible for maintaining SOUTH BOUND I-77?

SOUTH BOUND I-77 is owned and maintained by State Highway Agency.

How old is SOUTH BOUND I-77 and does age affect safety?

SOUTH BOUND I-77 was built in 1956, making it 70 years old and last reconstructed in 2000.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.