FALL CREEK RD
Carrying FALL CREEK RD over MELTON CR
S 6 T 22 N R 21 W, Taney, Missouri
Data updated May 2026
FHWA NBI record, refreshed with each annual release.
Bridge Snapshot: FALL CREEK RD
The FALL CREEK RD bridge in Taney, Missouri carries FALL CREEK RD over MELTON CR. It was built in 1993, making it 33 years old today. The structure is built primarily of concrete continuous and spans 3 sections, stretching 28.2 meters (93 feet) end to end. Daily traffic averages 800 vehicles, placing it in the lower-traffic tier of Missouri bridges. It is owned and maintained by City/Municipal Highway Agency.
The latest FHWA inspection records show culvert at 6/9. The weakest component sits in fair condition. All reported major components score above the Poor range. Its NBI inventory load rating is 21.6 metric tons.
Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.
How FALL CREEK RD compares
Live comparison across Missouri.
Historical Sufficiency Rating
PlainBridge-computedFHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.
Condition Ratings
Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.
Structural Details
- Year Built
- 1993
- Material
- Concrete Continuous
- Number of Spans
- 3
- Structure Length
- 28.2 m (93 ft)
- Owner
- City/Municipal Highway Agency
- Avg Daily Traffic
- 800 vehicles/day
- Structure Number
- 31298
Location
Data Source
FHWA National Bridge Inventory (NBI).
FHWA NBI Program ↗How to read this record
This page shows what the last federal inspection recorded, not whether FALL CREEK RD is safe to cross today. Here is how to use it.
- NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
- Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
- Compare FALL CREEK RD against other structures in Taney and across Missouri. Missouri bridges
- Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge
Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.
Frequently Asked Questions
What do the condition ratings mean for FALL CREEK RD?
FALL CREEK RD in Taney, Missouri on the FHWA's 0–9 scale.
How often is FALL CREEK RD inspected?
FALL CREEK RD's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 800 vehicles per day.
What does “structurally deficient” mean in older bridge reports?
FHWA retired that reported status beginning with the 2018 archive. FALL CREEK RD is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.
What is the inventory load rating for FALL CREEK RD?
FALL CREEK RD has an NBI inventory load rating of 21.6 metric tons.
Who is responsible for maintaining FALL CREEK RD?
FALL CREEK RD is owned and maintained by City/Municipal Highway Agency.
How old is FALL CREEK RD and does age affect safety?
FALL CREEK RD was built in 1993, making it 33 years old.
Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.
Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.