FHWA NBI 2024 Inspection record Public-domain dataset

BEAR DR

Carrying BEAR DR over IRRIGATION CANAL

0.25 MI N OF BELMONT LANE, Jefferson, Oregon

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Poor
12 t Inventory load rating

Bridge Snapshot: BEAR DR

The BEAR DR bridge in Jefferson, Oregon carries BEAR DR over IRRIGATION CANAL. It was built in 1952, making it 74 years old today. The structure is built primarily of wood or timber and spans 2 sections, stretching 16.2 meters (53 feet) end to end. Daily traffic averages 260 vehicles, placing it in the lower-traffic tier of Oregon bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 5/9, superstructure at 5/9, substructure at 4/9. The weakest component sits in poor condition. At least one major component here scores 4 or below, which produces a Poor condition classification under FHWA's current reporting rules. Its NBI inventory load rating is 12.3 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How BEAR DR compares

▼ 20.0
Load rating vs Oregon average (32.3 t)
Bottom 4%
Lower load rating than 96% of Oregon bridges
80
Bridges in Jefferson · 6 in Poor condition
BEAR DR 12.3 t
Oregon average 32.3 t

Live comparison across Oregon.

Historical Sufficiency Rating

PlainBridge-computed
27.2 / 100 - historical 20–49.9 band
Structural adequacy /55
0.7
Serviceability /30
11.7
Essentiality /15
14.8
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
5/9
Fair (5–6)
Superstructure
5/9
Fair (5–6)
Substructure
4/9
Poor (1–4)
Inventory Load Rating
12.3 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1952
Material
Wood or Timber
Number of Spans
2
Structure Length
16.2 m (53 ft)
Deck Width
7.3 m (24 ft)
Owner
County Highway Agency
Avg Daily Traffic
260 vehicles/day
Structure Number
31C83 000

Condition Analysis

  • At 5/9, the deck (driving surface) shows fair condition, with minor wear flagged for upkeep.
  • At 5/9, the superstructure (beams and supports above the deck) shows fair condition, with minor wear flagged for upkeep.
  • At 4/9, the substructure (piers and abutments) is in poor shape, with advanced wear flagged for priority repair.

How to read this record

BEAR DR is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare BEAR DR against other structures in Jefferson and across Oregon. Oregon bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for BEAR DR?

BEAR DR in Jefferson, Oregon has a deck rating of 5/9, superstructure rating of 5/9, and substructure rating of 4/9 on the FHWA's 0–9 scale.

How often is BEAR DR inspected?

BEAR DR's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 260 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. BEAR DR is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for BEAR DR?

BEAR DR has an NBI inventory load rating of 12.3 metric tons.

Who is responsible for maintaining BEAR DR?

BEAR DR is owned and maintained by County Highway Agency.

How old is BEAR DR and does age affect safety?

BEAR DR was built in 1952, making it 74 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.