FHWA NBI 2024 Inspection record Public-domain dataset

CHEYNE RD

Carrying CHEYNE RD over IRRIGATION CANAL

007 MI SOUTH OF MATNEY RD, Klamath, Oregon

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
23 t Inventory load rating

Bridge Snapshot: CHEYNE RD

The CHEYNE RD bridge in Klamath, Oregon carries CHEYNE RD over IRRIGATION CANAL. It was built in 1974, making it 52 years old today. The structure is built primarily of prestressed concrete and spans 1 section, stretching 11.0 meters (36 feet) end to end. Daily traffic averages 56 vehicles, placing it in the lower-traffic tier of Oregon bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 7/9, substructure at 6/9. The weakest component sits in fair condition. No reported major component scores in the Poor range under the current federal condition thresholds. Its NBI inventory load rating is 23.3 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How CHEYNE RD compares

▼ 9.0
Load rating vs Oregon average (32.3 t)
Bottom 31%
Lower load rating than 69% of Oregon bridges
248
Bridges in Klamath · 13 in Poor condition
CHEYNE RD 23.3 t
Oregon average 32.3 t

Live comparison across Oregon.

Historical Sufficiency Rating

PlainBridge-computed
88.0 / 100 - historical 80–100 band
Structural adequacy /55
46.1
Serviceability /30
30.0
Essentiality /15
15.0
Special reductions
−3.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
23.3 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1974
Material
Prestressed Concrete
Number of Spans
1
Structure Length
11.0 m (36 ft)
Deck Width
9.8 m (32 ft)
Owner
County Highway Agency
Avg Daily Traffic
56 vehicles/day
Structure Number
35C119097700070

Condition Analysis

  • The deck (driving surface) is in good condition (7/9), showing no significant deterioration.
  • The superstructure (beams and supports above the deck) is in good condition (7/9), showing no significant deterioration.
  • At 6/9, the substructure (piers and abutments) shows fair condition, with minor wear flagged for upkeep.

How to read this record

This page shows what the last federal inspection recorded, not whether CHEYNE RD is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare CHEYNE RD against other structures in Klamath and across Oregon. Oregon bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for CHEYNE RD?

CHEYNE RD in Klamath, Oregon has a deck rating of 7/9, superstructure rating of 7/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is CHEYNE RD inspected?

CHEYNE RD's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 56 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. CHEYNE RD is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for CHEYNE RD?

CHEYNE RD has an NBI inventory load rating of 23.3 metric tons.

Who is responsible for maintaining CHEYNE RD?

CHEYNE RD is owned and maintained by County Highway Agency.

How old is CHEYNE RD and does age affect safety?

CHEYNE RD was built in 1974, making it 52 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.