FHWA NBI 2024 Inspection record Public-domain dataset

N1-EMELINE AVE OFF

Carrying N1-EMELINE AVE OFF over BRANCIFORTE CREEK

05-SCR-001-16.43-SCR, Santa Cruz, California

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Good
32 t Inventory load rating

Bridge Snapshot: N1-EMELINE AVE OFF

The N1-EMELINE AVE OFF bridge in Santa Cruz, California carries N1-EMELINE AVE OFF over BRANCIFORTE CREEK. It was built in 2008, making it 18 years old today. The structure is built primarily of prestressed concrete and spans 3 sections, stretching 43.3 meters (142 feet) end to end. Daily traffic averages 30,000 vehicles, placing it in the heavily-trafficked tier of California bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 7/9, substructure at 7/9. The weakest component sits in good condition. All reported major components score above the Poor range. Its NBI inventory load rating is 32.4 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How N1-EMELINE AVE OFF compares

▲ 1.1
Load rating vs California average (31.3 t)
Bottom 41%
Lower load rating than 59% of California bridges
203
Bridges in Santa Cruz · 32 in Poor condition
N1-EMELINE AVE OFF 32.4 t
California average 31.3 t

Live comparison across California.

Historical Sufficiency Rating

PlainBridge-computed
98.6 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
30.0
Essentiality /15
13.6
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
7/9
Good (7–9)
Inventory Load Rating
32.4 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
2008
Material
Prestressed Concrete
Number of Spans
3
Structure Length
43.3 m (142 ft)
Deck Width
8.1 m (27 ft)
Owner
State Highway Agency
Avg Daily Traffic
30,000 vehicles/day
Structure Number
36 0060S

Condition Analysis

  • The deck (driving surface) is in good condition (7/9), showing no significant deterioration.
  • The superstructure (beams and supports above the deck) is in good condition (7/9), showing no significant deterioration.
  • At 7/9, the substructure (piers and abutments) is in good shape and shows no significant wear.

How to read this record

This page shows what the last federal inspection recorded, not whether N1-EMELINE AVE OFF is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare N1-EMELINE AVE OFF against other structures in Santa Cruz and across California. California bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for N1-EMELINE AVE OFF?

N1-EMELINE AVE OFF in Santa Cruz, California has a deck rating of 7/9, superstructure rating of 7/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is N1-EMELINE AVE OFF inspected?

N1-EMELINE AVE OFF's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 30,000 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. N1-EMELINE AVE OFF is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for N1-EMELINE AVE OFF?

N1-EMELINE AVE OFF has an NBI inventory load rating of 32.4 metric tons.

Who is responsible for maintaining N1-EMELINE AVE OFF?

N1-EMELINE AVE OFF is owned and maintained by State Highway Agency.

How old is N1-EMELINE AVE OFF and does age affect safety?

N1-EMELINE AVE OFF was built in 2008, making it 18 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.