FHWA NBI 2024 Inspection record Public-domain dataset

CR 25E

Carrying CR 25E over Beatty Walker Ditch

00.02 N of CR 450 N, Jackson, Indiana

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
27 t Inventory load rating

Bridge Snapshot: CR 25E

The CR 25E bridge in Jackson, Indiana carries CR 25E over Beatty Walker Ditch. It was built in 1975, making it 51 years old today. The structure is built primarily of concrete continuous and spans 3 sections, stretching 20.2 meters (66 feet) end to end. Daily traffic averages 485 vehicles, placing it in the lower-traffic tier of Indiana bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 6/9, substructure at 7/9. The weakest component sits in fair condition. None of this bridge's reported major components fall into the Poor condition range. Its NBI inventory load rating is 26.6 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How CR 25E compares

▼ 9.0
Load rating vs Indiana average (35.6 t)
Bottom 16%
Lower load rating than 84% of Indiana bridges
308
Bridges in Jackson · 8 in Poor condition
CR 25E 26.6 t
Indiana average 35.6 t

Live comparison across Indiana.

Historical Sufficiency Rating

PlainBridge-computed
85.5 / 100 - historical 80–100 band
Structural adequacy /55
50.5
Serviceability /30
23.2
Essentiality /15
14.9
Special reductions
−3.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
6/9
Fair (5–6)
Substructure
7/9
Good (7–9)
Inventory Load Rating
26.6 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1975
Material
Concrete Continuous
Number of Spans
3
Structure Length
20.2 m (66 ft)
Deck Width
8.6 m (28 ft)
Owner
County Highway Agency
Avg Daily Traffic
485 vehicles/day
Structure Number
3600039

Condition Analysis

  • At 6/9, the deck (driving surface) shows fair condition, with minor wear flagged for upkeep.
  • At 6/9, the superstructure (beams and supports above the deck) shows fair condition, with minor wear flagged for upkeep.
  • The substructure (piers and abutments) rates good at 7/9, with no significant deterioration on file.

How to read this record

This page shows what the last federal inspection recorded, not whether CR 25E is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare CR 25E against other structures in Jackson and across Indiana. Indiana bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for CR 25E?

CR 25E in Jackson, Indiana has a deck rating of 6/9, superstructure rating of 6/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is CR 25E inspected?

CR 25E's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 485 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. CR 25E is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for CR 25E?

CR 25E has an NBI inventory load rating of 26.6 metric tons.

Who is responsible for maintaining CR 25E?

CR 25E is owned and maintained by County Highway Agency.

How old is CR 25E and does age affect safety?

CR 25E was built in 1975, making it 51 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.