FHWA NBI 2024 Inspection record Public-domain dataset

HOLLADAY RD #225

Carrying HOLLADAY RD #225 over ROCKY FORK CREEK

1 MI NW US62, Highland, Ohio

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Good
29 t Inventory load rating

Bridge Snapshot: HOLLADAY RD #225

The HOLLADAY RD #225 bridge in Highland, Ohio carries HOLLADAY RD #225 over ROCKY FORK CREEK. It was built in 1991, making it 35 years old today. The structure is built primarily of prestressed concrete and spans 1 section, stretching 13.7 meters (45 feet) end to end. Daily traffic averages 629 vehicles, placing it in the lower-traffic tier of Ohio bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 8/9, superstructure at 8/9, substructure at 8/9. The weakest component sits in good condition. None of this bridge's reported major components fall into the Poor condition range. Its NBI inventory load rating is 29.2 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How HOLLADAY RD #225 compares

▼ 8.3
Load rating vs Ohio average (37.5 t)
Bottom 19%
Lower load rating than 81% of Ohio bridges
245
Bridges in Highland · 5 in Poor condition
HOLLADAY RD #225 29.2 t
Ohio average 37.5 t

Live comparison across Ohio.

Historical Sufficiency Rating

PlainBridge-computed
79.0 / 100 - historical 50–79.9 band
Structural adequacy /55
53.1
Serviceability /30
11.0
Essentiality /15
14.9
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
8/9
Good (7–9)
Superstructure
8/9
Good (7–9)
Substructure
8/9
Good (7–9)
Inventory Load Rating
29.2 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1991
Material
Prestressed Concrete
Number of Spans
1
Structure Length
13.7 m (45 ft)
Deck Width
6.1 m (20 ft)
Owner
County Highway Agency
Avg Daily Traffic
629 vehicles/day
Structure Number
3632636

Condition Analysis

  • The deck (driving surface) is in good condition (8/9), showing no significant deterioration.
  • At 8/9, the superstructure (beams and supports above the deck) is in good shape and shows no significant wear.
  • At 8/9, the substructure (piers and abutments) is in good shape and shows no significant wear.

How to read this record

This page shows what the last federal inspection recorded, not whether HOLLADAY RD #225 is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare HOLLADAY RD #225 against other structures in Highland and across Ohio. Ohio bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for HOLLADAY RD #225?

HOLLADAY RD #225 in Highland, Ohio has a deck rating of 8/9, superstructure rating of 8/9, and substructure rating of 8/9 on the FHWA's 0–9 scale.

How often is HOLLADAY RD #225 inspected?

HOLLADAY RD #225's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 629 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. HOLLADAY RD #225 is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for HOLLADAY RD #225?

HOLLADAY RD #225 has an NBI inventory load rating of 29.2 metric tons.

Who is responsible for maintaining HOLLADAY RD #225?

HOLLADAY RD #225 is owned and maintained by County Highway Agency.

How old is HOLLADAY RD #225 and does age affect safety?

HOLLADAY RD #225 was built in 1991, making it 35 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.