FHWA NBI 2024 Inspection record Public-domain dataset

DAWLEY-NEW PITSBUR

Carrying DAWLEY-NEW PITSBUR over MONDAY CREEK

0.93 MI E OF SR 278, Hocking, Ohio

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
42 t Inventory load rating

Bridge Snapshot: DAWLEY-NEW PITSBUR

The DAWLEY-NEW PITSBUR bridge in Hocking, Ohio carries DAWLEY-NEW PITSBUR over MONDAY CREEK. It was built in 1900, making it 126 years old today. It was last reconstructed in 1973, extending its service life. The structure is built primarily of prestressed concrete and spans 1 section, stretching 17.1 meters (56 feet) end to end. Daily traffic averages 162 vehicles, placing it in the lower-traffic tier of Ohio bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 7/9, substructure at 6/9. The weakest component sits in fair condition. None of this bridge's reported major components fall into the Poor condition range. Its NBI inventory load rating is 42.1 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How DAWLEY-NEW PITSBUR compares

▲ 4.6
Load rating vs Ohio average (37.5 t)
Top 31%
Higher load rating than 69% of Ohio bridges
293
Bridges in Hocking · 2 in Poor condition
DAWLEY-NEW PITSBUR 42.1 t
Ohio average 37.5 t

Live comparison across Ohio.

Historical Sufficiency Rating

PlainBridge-computed
85.4 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
25.0
Essentiality /15
13.4
Special reductions
−8.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
7/9
Good (7–9)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
42.1 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1900
Last Reconstructed
1973
Material
Prestressed Concrete
Number of Spans
1
Structure Length
17.1 m (56 ft)
Deck Width
5.5 m (18 ft)
Owner
County Highway Agency
Avg Daily Traffic
162 vehicles/day
Structure Number
3733971

Condition Analysis

  • The deck (driving surface) is in fair condition (6/9), with minor deterioration that may require routine maintenance.
  • The superstructure (beams and supports above the deck) is in good condition (7/9), showing no significant deterioration.
  • At 6/9, the substructure (piers and abutments) shows fair condition, with minor wear flagged for upkeep.

How to read this record

This page shows what the last federal inspection recorded, not whether DAWLEY-NEW PITSBUR is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare DAWLEY-NEW PITSBUR against other structures in Hocking and across Ohio. Ohio bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for DAWLEY-NEW PITSBUR?

DAWLEY-NEW PITSBUR in Hocking, Ohio has a deck rating of 6/9, superstructure rating of 7/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is DAWLEY-NEW PITSBUR inspected?

DAWLEY-NEW PITSBUR's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 162 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. DAWLEY-NEW PITSBUR is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for DAWLEY-NEW PITSBUR?

DAWLEY-NEW PITSBUR has an NBI inventory load rating of 42.1 metric tons.

Who is responsible for maintaining DAWLEY-NEW PITSBUR?

DAWLEY-NEW PITSBUR is owned and maintained by County Highway Agency.

How old is DAWLEY-NEW PITSBUR and does age affect safety?

DAWLEY-NEW PITSBUR was built in 1900, making it 126 years old and last reconstructed in 1973.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.