FHWA NBI 2024 Inspection record Public-domain dataset

RP.I80EB TO I215SB

Carrying RP.I80EB TO I215SB over UNION PACIFIC RAILROAD

NO.OF 500 SO.AT 2000 W., Salt Lake, Utah

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
51 t Inventory load rating

Bridge Snapshot: RP.I80EB TO I215SB

The RP.I80EB TO I215SB bridge in Salt Lake, Utah carries RP.I80EB TO I215SB over UNION PACIFIC RAILROAD. It was built in 1987, making it 39 years old today. The structure is built primarily of steel continuous and spans 3 sections, stretching 67.4 meters (221 feet) end to end. Daily traffic averages 17,334 vehicles, placing it in the heavily-trafficked tier of Utah bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 7/9, substructure at 6/9. The weakest component sits in fair condition. None of this bridge's reported major components fall into the Poor condition range. Its NBI inventory load rating is 50.5 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How RP.I80EB TO I215SB compares

▲ 13.7
Load rating vs Utah average (36.8 t)
Top 15%
Higher load rating than 85% of Utah bridges
659
Bridges in Salt Lake · 18 in Poor condition
RP.I80EB TO I215SB 50.5 t
Utah average 36.8 t

Live comparison across Utah.

Historical Sufficiency Rating

PlainBridge-computed
92.9 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
29.0
Essentiality /15
8.9
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
50.5 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1987
Material
Steel Continuous
Number of Spans
3
Structure Length
67.4 m (221 ft)
Deck Width
12.8 m (42 ft)
Owner
State Highway Agency
Avg Daily Traffic
17,334 vehicles/day
Structure Number
3C 695

Condition Analysis

  • The deck (driving surface) rates good at 7/9, with no significant deterioration on file.
  • The superstructure (beams and supports above the deck) rates good at 7/9, with no significant deterioration on file.
  • At 6/9, the substructure (piers and abutments) shows fair condition, with minor wear flagged for upkeep.

How to read this record

This page shows what the last federal inspection recorded, not whether RP.I80EB TO I215SB is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare RP.I80EB TO I215SB against other structures in Salt Lake and across Utah. Utah bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for RP.I80EB TO I215SB?

RP.I80EB TO I215SB in Salt Lake, Utah has a deck rating of 7/9, superstructure rating of 7/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is RP.I80EB TO I215SB inspected?

RP.I80EB TO I215SB's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 17,334 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. RP.I80EB TO I215SB is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for RP.I80EB TO I215SB?

RP.I80EB TO I215SB has an NBI inventory load rating of 50.5 metric tons.

Who is responsible for maintaining RP.I80EB TO I215SB?

RP.I80EB TO I215SB is owned and maintained by State Highway Agency.

How old is RP.I80EB TO I215SB and does age affect safety?

RP.I80EB TO I215SB was built in 1987, making it 39 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.