FHWA NBI 2024 Inspection record Public-domain dataset

BASE LINE ROAD

Carrying BASE LINE ROAD over SAND CREEK

00.14 N OF CR 580 N, Jennings, Indiana

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
47 t Inventory load rating

Bridge Snapshot: BASE LINE ROAD

The BASE LINE ROAD bridge in Jennings, Indiana carries BASE LINE ROAD over SAND CREEK. It was built in 1968, making it 58 years old today. It was last reconstructed in 2000, extending its service life. The structure is built primarily of prestressed concrete and spans 4 sections, stretching 68.3 meters (224 feet) end to end. Daily traffic averages 475 vehicles, placing it in the lower-traffic tier of Indiana bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 7/9, substructure at 6/9. The weakest component sits in fair condition. All reported major components score above the Poor range. Its NBI inventory load rating is 47.0 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How BASE LINE ROAD compares

▲ 11.4
Load rating vs Indiana average (35.6 t)
Top 12%
Higher load rating than 88% of Indiana bridges
148
Bridges in Jennings · 14 in Poor condition
BASE LINE ROAD 47.0 t
Indiana average 35.6 t

Live comparison across Indiana.

Historical Sufficiency Rating

PlainBridge-computed
79.6 / 100 - historical 50–79.9 band
Structural adequacy /55
55.0
Serviceability /30
13.0
Essentiality /15
14.6
Special reductions
−3.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
7/9
Good (7–9)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
47.0 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1968
Last Reconstructed
2000
Material
Prestressed Concrete
Number of Spans
4
Structure Length
68.3 m (224 ft)
Deck Width
7.4 m (24 ft)
Owner
County Highway Agency
Avg Daily Traffic
475 vehicles/day
Structure Number
4000109

Condition Analysis

  • The deck (driving surface) is in fair condition (6/9), with minor deterioration that may require routine maintenance.
  • The superstructure (beams and supports above the deck) is in good condition (7/9), showing no significant deterioration.
  • The substructure (piers and abutments) rates fair at 6/9, minor deterioration that routine maintenance should address.

How to read this record

This page shows what the last federal inspection recorded, not whether BASE LINE ROAD is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare BASE LINE ROAD against other structures in Jennings and across Indiana. Indiana bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for BASE LINE ROAD?

BASE LINE ROAD in Jennings, Indiana has a deck rating of 6/9, superstructure rating of 7/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is BASE LINE ROAD inspected?

BASE LINE ROAD's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 475 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. BASE LINE ROAD is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for BASE LINE ROAD?

BASE LINE ROAD has an NBI inventory load rating of 47.0 metric tons.

Who is responsible for maintaining BASE LINE ROAD?

BASE LINE ROAD is owned and maintained by County Highway Agency.

How old is BASE LINE ROAD and does age affect safety?

BASE LINE ROAD was built in 1968, making it 58 years old and last reconstructed in 2000.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.