FHWA NBI 2024 Inspection record Public-domain dataset

CAMP 12 LOOP

Carrying CAMP 12 LOOP over MILL CREEK

010 MI S OF SILETZ, Lincoln, Oregon

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Poor
13 t Inventory load rating

Bridge Snapshot: CAMP 12 LOOP

The CAMP 12 LOOP bridge in Lincoln, Oregon carries CAMP 12 LOOP over MILL CREEK. It was built in 1975, making it 51 years old today. The structure is built primarily of wood or timber and spans 4 sections, stretching 25.9 meters (85 feet) end to end. Daily traffic averages 106 vehicles, placing it in the lower-traffic tier of Oregon bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 8/9, superstructure at 6/9, substructure at 2/9. The weakest component sits in critical condition. At least one major component here scores 4 or below, which produces a Poor condition classification under FHWA's current reporting rules. Its NBI inventory load rating is 13.3 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How CAMP 12 LOOP compares

▼ 19.0
Load rating vs Oregon average (32.3 t)
Bottom 5%
Lower load rating than 95% of Oregon bridges
190
Bridges in Lincoln · 14 in Poor condition
CAMP 12 LOOP 13.3 t
Oregon average 32.3 t

Live comparison across Oregon.

Historical Sufficiency Rating

PlainBridge-computed
35.5 / 100 - historical 20–49.9 band
Structural adequacy /55
0.0
Serviceability /30
20.5
Essentiality /15
15.0
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
8/9
Good (7–9)
Superstructure
6/9
Fair (5–6)
Substructure
2/9
Poor (1–4)
Inventory Load Rating
13.3 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1975
Material
Wood or Timber
Number of Spans
4
Structure Length
25.9 m (85 ft)
Deck Width
8.4 m (28 ft)
Owner
County Highway Agency
Avg Daily Traffic
106 vehicles/day
Structure Number
41C12 45301 016

Condition Analysis

  • At 8/9, the deck (driving surface) is in good shape and shows no significant wear.
  • At 6/9, the superstructure (beams and supports above the deck) shows fair condition, with minor wear flagged for upkeep.
  • The substructure (piers and abutments) is in critical condition (2/9), with severe deterioration requiring urgent attention.

How to read this record

CAMP 12 LOOP is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare CAMP 12 LOOP against other structures in Lincoln and across Oregon. Oregon bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for CAMP 12 LOOP?

CAMP 12 LOOP in Lincoln, Oregon has a deck rating of 8/9, superstructure rating of 6/9, and substructure rating of 2/9 on the FHWA's 0–9 scale.

How often is CAMP 12 LOOP inspected?

CAMP 12 LOOP's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 106 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. CAMP 12 LOOP is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for CAMP 12 LOOP?

CAMP 12 LOOP has an NBI inventory load rating of 13.3 metric tons.

Who is responsible for maintaining CAMP 12 LOOP?

CAMP 12 LOOP is owned and maintained by County Highway Agency.

How old is CAMP 12 LOOP and does age affect safety?

CAMP 12 LOOP was built in 1975, making it 51 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.