FHWA NBI 2024 Inspection record Public-domain dataset

S JAMES ROAD

Carrying S JAMES ROAD over JAMES BYPASS OVERFLOW

3.7 MI SOUTH OF S.H. 180, Fresno, California

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
29 t Inventory load rating

Bridge Snapshot: S JAMES ROAD

The S JAMES ROAD bridge in Fresno, California carries S JAMES ROAD over JAMES BYPASS OVERFLOW. It was built in 1956, making it 70 years old today. The structure is built primarily of concrete continuous and spans 4 sections, stretching 27.7 meters (91 feet) end to end. Daily traffic averages 2,200 vehicles, placing it in the moderately-trafficked tier of California bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 7/9, substructure at 5/9. The weakest component sits in fair condition. No reported major component scores in the Poor range under the current federal condition thresholds. Its NBI inventory load rating is 29.2 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How S JAMES ROAD compares

▼ 2.1
Load rating vs California average (31.3 t)
Bottom 35%
Lower load rating than 65% of California bridges
929
Bridges in Fresno · 33 in Poor condition
S JAMES ROAD 29.2 t
California average 31.3 t

Live comparison across California.

Historical Sufficiency Rating

PlainBridge-computed
79.9 / 100 - historical 50–79.9 band
Structural adequacy /55
43.1
Serviceability /30
28.0
Essentiality /15
9.8
Special reductions
−1.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
5/9
Fair (5–6)
Inventory Load Rating
29.2 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1956
Material
Concrete Continuous
Number of Spans
4
Structure Length
27.7 m (91 ft)
Deck Width
11.1 m (36 ft)
Owner
County Highway Agency
Avg Daily Traffic
2,200 vehicles/day
Structure Number
42C0060

Condition Analysis

  • At 7/9, the deck (driving surface) is in good shape and shows no significant wear.
  • The superstructure (beams and supports above the deck) is in good condition (7/9), showing no significant deterioration.
  • The substructure (piers and abutments) rates fair at 5/9, minor deterioration that routine maintenance should address.

How to read this record

This page shows what the last federal inspection recorded, not whether S JAMES ROAD is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare S JAMES ROAD against other structures in Fresno and across California. California bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for S JAMES ROAD?

S JAMES ROAD in Fresno, California has a deck rating of 7/9, superstructure rating of 7/9, and substructure rating of 5/9 on the FHWA's 0–9 scale.

How often is S JAMES ROAD inspected?

S JAMES ROAD's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 2,200 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. S JAMES ROAD is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for S JAMES ROAD?

S JAMES ROAD has an NBI inventory load rating of 29.2 metric tons.

Who is responsible for maintaining S JAMES ROAD?

S JAMES ROAD is owned and maintained by County Highway Agency.

How old is S JAMES ROAD and does age affect safety?

S JAMES ROAD was built in 1956, making it 70 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.