FHWA NBI 2024 Inspection record Public-domain dataset

CRAZY HORSE CANYON

Carrying CRAZY HORSE CANYON over WETLAND

05-MON-000-0.00, Monterey, California

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
32 t Inventory load rating

Bridge Snapshot: CRAZY HORSE CANYON

The CRAZY HORSE CANYON bridge in Monterey, California carries CRAZY HORSE CANYON over WETLAND. It was built in 2013, making it 13 years old today. The structure is built primarily of prestressed concrete continuous and spans 3 sections, stretching 145.0 meters (476 feet) end to end. Daily traffic averages 4,528 vehicles, placing it in the moderately-trafficked tier of California bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 7/9, substructure at 6/9. The weakest component sits in fair condition. All reported major components score above the Poor range. Its NBI inventory load rating is 32.4 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How CRAZY HORSE CANYON compares

▲ 1.1
Load rating vs California average (31.3 t)
Bottom 41%
Lower load rating than 59% of California bridges
390
Bridges in Monterey · 28 in Poor condition
CRAZY HORSE CANYON 32.4 t
California average 31.3 t

Live comparison across California.

Historical Sufficiency Rating

PlainBridge-computed
91.0 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
29.0
Essentiality /15
9.0
Special reductions
−2.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
32.4 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
2013
Material
Prestressed Concrete Continuous
Number of Spans
3
Structure Length
145.0 m (476 ft)
Deck Width
15.6 m (51 ft)
Owner
State Highway Agency
Avg Daily Traffic
4,528 vehicles/day
Structure Number
44 0288Y

Condition Analysis

  • The deck (driving surface) rates good at 7/9, with no significant deterioration on file.
  • The superstructure (beams and supports above the deck) rates good at 7/9, with no significant deterioration on file.
  • At 6/9, the substructure (piers and abutments) shows fair condition, with minor wear flagged for upkeep.

How to read this record

This page shows what the last federal inspection recorded, not whether CRAZY HORSE CANYON is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare CRAZY HORSE CANYON against other structures in Monterey and across California. California bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for CRAZY HORSE CANYON?

CRAZY HORSE CANYON in Monterey, California has a deck rating of 7/9, superstructure rating of 7/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is CRAZY HORSE CANYON inspected?

CRAZY HORSE CANYON's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 4,528 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. CRAZY HORSE CANYON is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for CRAZY HORSE CANYON?

CRAZY HORSE CANYON has an NBI inventory load rating of 32.4 metric tons.

Who is responsible for maintaining CRAZY HORSE CANYON?

CRAZY HORSE CANYON is owned and maintained by State Highway Agency.

How old is CRAZY HORSE CANYON and does age affect safety?

CRAZY HORSE CANYON was built in 2013, making it 13 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.