FHWA NBI 2024 Inspection record Public-domain dataset

AVE 174 (LINDA)

Carrying AVE 174 (LINDA) over FRIANT-KERN CANAL

0.3 MI WEST OF ROAD 232, Tulare, California

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
10 t Inventory load rating

Bridge Snapshot: AVE 174 (LINDA)

The AVE 174 (LINDA) bridge in Tulare, California carries AVE 174 (LINDA) over FRIANT-KERN CANAL. It was built in 1949, making it 77 years old today. The structure is built primarily of concrete and spans 2 sections, stretching 28.0 meters (92 feet) end to end. Daily traffic averages 750 vehicles, placing it in the lower-traffic tier of California bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 7/9, substructure at 5/9. The weakest component sits in fair condition. All reported major components score above the Poor range. Its NBI inventory load rating is 10.4 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How AVE 174 (LINDA) compares

▼ 20.9
Load rating vs California average (31.3 t)
Bottom 1%
Lower load rating than 99% of California bridges
599
Bridges in Tulare · 19 in Poor condition
AVE 174 (LINDA) 10.4 t
California average 31.3 t

Live comparison across California.

Historical Sufficiency Rating

PlainBridge-computed
32.6 / 100 - historical 20–49.9 band
Structural adequacy /55
11.4
Serviceability /30
7.0
Essentiality /15
14.2
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
5/9
Fair (5–6)
Inventory Load Rating
10.4 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1949
Material
Concrete
Number of Spans
2
Structure Length
28.0 m (92 ft)
Deck Width
6.8 m (22 ft)
Owner
County Highway Agency
Avg Daily Traffic
750 vehicles/day
Structure Number
46C0263

Condition Analysis

  • The deck (driving surface) rates good at 7/9, with no significant deterioration on file.
  • The superstructure (beams and supports above the deck) is in good condition (7/9), showing no significant deterioration.
  • The substructure (piers and abutments) rates fair at 5/9, minor deterioration that routine maintenance should address.

How to read this record

This page shows what the last federal inspection recorded, not whether AVE 174 (LINDA) is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare AVE 174 (LINDA) against other structures in Tulare and across California. California bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for AVE 174 (LINDA)?

AVE 174 (LINDA) in Tulare, California has a deck rating of 7/9, superstructure rating of 7/9, and substructure rating of 5/9 on the FHWA's 0–9 scale.

How often is AVE 174 (LINDA) inspected?

AVE 174 (LINDA)'s responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 750 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. AVE 174 (LINDA) is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for AVE 174 (LINDA)?

AVE 174 (LINDA) has an NBI inventory load rating of 10.4 metric tons.

Who is responsible for maintaining AVE 174 (LINDA)?

AVE 174 (LINDA) is owned and maintained by County Highway Agency.

How old is AVE 174 (LINDA) and does age affect safety?

AVE 174 (LINDA) was built in 1949, making it 77 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.