FHWA NBI 2024 Inspection record Public-domain dataset

SR 58

Carrying SR 58 over BRANCH OF BEAVER CREEK

.57 MILES NORTH OF SR 2, Lorain, Ohio

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Poor
32 t Inventory load rating

Bridge Snapshot: SR 58

The SR 58 bridge in Lorain, Ohio carries SR 58 over BRANCH OF BEAVER CREEK. It was built in 1965, making it 61 years old today. The structure is built primarily of concrete continuous and spans 3 sections, stretching 24.4 meters (80 feet) end to end. Daily traffic averages 19,498 vehicles, placing it in the heavily-trafficked tier of Ohio bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 4/9, superstructure at 4/9, substructure at 5/9. The weakest component sits in poor condition. Because at least one major component scores 4 or lower, this bridge falls in FHWA's Poor condition category. That category is not a closure order. Its NBI inventory load rating is 32.4 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How SR 58 compares

▼ 5.1
Load rating vs Ohio average (37.5 t)
Bottom 26%
Lower load rating than 74% of Ohio bridges
366
Bridges in Lorain · 18 in Poor condition
SR 58 32.4 t
Ohio average 37.5 t

Live comparison across Ohio.

Historical Sufficiency Rating

PlainBridge-computed
50.0 / 100 - historical 50–79.9 band
Structural adequacy /55
30.0
Serviceability /30
20.0
Essentiality /15
0.0
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
4/9
Poor (1–4)
Superstructure
4/9
Poor (1–4)
Substructure
5/9
Fair (5–6)
Inventory Load Rating
32.4 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1965
Material
Concrete Continuous
Number of Spans
3
Structure Length
24.4 m (80 ft)
Deck Width
20.7 m (68 ft)
Owner
State Highway Agency
Avg Daily Traffic
19,498 vehicles/day
Structure Number
4703510

Condition Analysis

  • The deck (driving surface) rates poor at 4/9, advanced deterioration that should be prioritized for repair.
  • The superstructure (beams and supports above the deck) rates poor at 4/9, advanced deterioration that should be prioritized for repair.
  • At 5/9, the substructure (piers and abutments) shows fair condition, with minor wear flagged for upkeep.

How to read this record

SR 58 is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare SR 58 against other structures in Lorain and across Ohio. Ohio bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for SR 58?

SR 58 in Lorain, Ohio has a deck rating of 4/9, superstructure rating of 4/9, and substructure rating of 5/9 on the FHWA's 0–9 scale.

How often is SR 58 inspected?

SR 58's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 19,498 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. SR 58 is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for SR 58?

SR 58 has an NBI inventory load rating of 32.4 metric tons.

Who is responsible for maintaining SR 58?

SR 58 is owned and maintained by State Highway Agency.

How old is SR 58 and does age affect safety?

SR 58 was built in 1965, making it 61 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.