FHWA NBI 2024 Inspection record Public-domain dataset

LABISH CENTER RD.

Carrying LABISH CENTER RD. over LITTLE PUDDING RIVER

02.0 WEST OF NORTH HOWELL, Marion, Oregon

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
21 t Inventory load rating

Bridge Snapshot: LABISH CENTER RD.

The LABISH CENTER RD. bridge in Marion, Oregon carries LABISH CENTER RD. over LITTLE PUDDING RIVER. It was built in 1972, making it 54 years old today. The structure is built primarily of wood or timber and spans 11 sections, stretching 63.7 meters (209 feet) end to end. Daily traffic averages 926 vehicles, placing it in the lower-traffic tier of Oregon bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 5/9, superstructure at 5/9, substructure at 5/9. The weakest component sits in fair condition. None of this bridge's reported major components fall into the Poor condition range. Its NBI inventory load rating is 21.4 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How LABISH CENTER RD. compares

▼ 10.9
Load rating vs Oregon average (32.3 t)
Bottom 24%
Lower load rating than 76% of Oregon bridges
373
Bridges in Marion · 16 in Poor condition
LABISH CENTER RD. 21.4 t
Oregon average 32.3 t

Live comparison across Oregon.

Historical Sufficiency Rating

PlainBridge-computed
52.6 / 100 - historical 50–79.9 band
Structural adequacy /55
33.1
Serviceability /30
7.0
Essentiality /15
14.4
Special reductions
−2.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
5/9
Fair (5–6)
Superstructure
5/9
Fair (5–6)
Substructure
5/9
Fair (5–6)
Inventory Load Rating
21.4 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1972
Material
Wood or Timber
Number of Spans
11
Structure Length
63.7 m (209 ft)
Deck Width
7.9 m (26 ft)
Owner
County Highway Agency
Avg Daily Traffic
926 vehicles/day
Structure Number
47C49 634 00000

Condition Analysis

  • The deck (driving surface) is in fair condition (5/9), with minor deterioration that may require routine maintenance.
  • The superstructure (beams and supports above the deck) is in fair condition (5/9), with minor deterioration that may require routine maintenance.
  • At 5/9, the substructure (piers and abutments) shows fair condition, with minor wear flagged for upkeep.

How to read this record

This page shows what the last federal inspection recorded, not whether LABISH CENTER RD. is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare LABISH CENTER RD. against other structures in Marion and across Oregon. Oregon bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for LABISH CENTER RD.?

LABISH CENTER RD. in Marion, Oregon has a deck rating of 5/9, superstructure rating of 5/9, and substructure rating of 5/9 on the FHWA's 0–9 scale.

How often is LABISH CENTER RD. inspected?

LABISH CENTER RD.'s responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 926 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. LABISH CENTER RD. is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for LABISH CENTER RD.?

LABISH CENTER RD. has an NBI inventory load rating of 21.4 metric tons.

Who is responsible for maintaining LABISH CENTER RD.?

LABISH CENTER RD. is owned and maintained by County Highway Agency.

How old is LABISH CENTER RD. and does age affect safety?

LABISH CENTER RD. was built in 1972, making it 54 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.