FHWA NBI 2024 Inspection record Public-domain dataset

US98 SR30 SR298

Carrying US98 SR30 SR298 over Perdido Bay

Alabama-Florida Line, Escambia, Florida

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
57 t Inventory load rating

Bridge Snapshot: US98 SR30 SR298

The US98 SR30 SR298 bridge in Escambia, Florida carries US98 SR30 SR298 over Perdido Bay. It was built in 1981, making it 45 years old today. The structure is built primarily of prestressed concrete continuous and spans 29 sections, stretching 673.9 meters (2211 feet) end to end. Daily traffic averages 14,515 vehicles, placing it in the heavily-trafficked tier of Florida bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 7/9, substructure at 6/9. The weakest component sits in fair condition. None of this bridge's reported major components fall into the Poor condition range. Its NBI inventory load rating is 57.2 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How US98 SR30 SR298 compares

▲ 18.3
Load rating vs Florida average (38.9 t)
Top 10%
Higher load rating than 90% of Florida bridges
250
Bridges in Escambia · 7 in Poor condition
US98 SR30 SR298 57.2 t
Florida average 38.9 t

Live comparison across Florida.

Historical Sufficiency Rating

PlainBridge-computed
85.0 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
30.0
Essentiality /15
0.0
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
7/9
Good (7–9)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
57.2 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1981
Material
Prestressed Concrete Continuous
Number of Spans
29
Structure Length
673.9 m (2211 ft)
Deck Width
14.2 m (47 ft)
Owner
State Highway Agency
Avg Daily Traffic
14,515 vehicles/day
Structure Number
480140

Condition Analysis

  • At 6/9, the deck (driving surface) shows fair condition, with minor wear flagged for upkeep.
  • The superstructure (beams and supports above the deck) is in good condition (7/9), showing no significant deterioration.
  • The substructure (piers and abutments) is in fair condition (6/9), with minor deterioration that may require routine maintenance.

How to read this record

This page shows what the last federal inspection recorded, not whether US98 SR30 SR298 is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare US98 SR30 SR298 against other structures in Escambia and across Florida. Florida bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for US98 SR30 SR298?

US98 SR30 SR298 in Escambia, Florida has a deck rating of 6/9, superstructure rating of 7/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is US98 SR30 SR298 inspected?

US98 SR30 SR298's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 14,515 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. US98 SR30 SR298 is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for US98 SR30 SR298?

US98 SR30 SR298 has an NBI inventory load rating of 57.2 metric tons.

Who is responsible for maintaining US98 SR30 SR298?

US98 SR30 SR298 is owned and maintained by State Highway Agency.

How old is US98 SR30 SR298 and does age affect safety?

US98 SR30 SR298 was built in 1981, making it 45 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.