FHWA NBI 2024 Inspection record Public-domain dataset

79TH ST

Carrying 79TH ST over FALL CREEK

00.26 E OF FALL CREEK RD, Marion, Indiana

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
29 t Inventory load rating

Bridge Snapshot: 79TH ST

The 79TH ST bridge in Marion, Indiana carries 79TH ST over FALL CREEK. It was built in 1966, making it 60 years old today. It was last reconstructed in 1997, extending its service life. The structure is built primarily of prestressed concrete and spans 3 sections, stretching 77.4 meters (254 feet) end to end. Daily traffic averages 22,309 vehicles, placing it in the heavily-trafficked tier of Indiana bridges. It is owned and maintained by City/Municipal Highway Agency.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 6/9, substructure at 7/9. The weakest component sits in fair condition. All reported major components score above the Poor range. Its NBI inventory load rating is 28.8 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How 79TH ST compares

▼ 6.8
Load rating vs Indiana average (35.6 t)
Bottom 22%
Lower load rating than 78% of Indiana bridges
964
Bridges in Marion · 36 in Poor condition
79TH ST 28.8 t
Indiana average 35.6 t

Live comparison across Indiana.

Historical Sufficiency Rating

PlainBridge-computed
83.7 / 100 - historical 80–100 band
Structural adequacy /55
52.8
Serviceability /30
28.0
Essentiality /15
2.9
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
6/9
Fair (5–6)
Substructure
7/9
Good (7–9)
Inventory Load Rating
28.8 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1966
Last Reconstructed
1997
Material
Prestressed Concrete
Number of Spans
3
Structure Length
77.4 m (254 ft)
Deck Width
10.7 m (35 ft)
Owner
City/Municipal Highway Agency
Avg Daily Traffic
22,309 vehicles/day
Structure Number
4900033

Condition Analysis

  • The deck (driving surface) is in fair condition (6/9), with minor deterioration that may require routine maintenance.
  • At 6/9, the superstructure (beams and supports above the deck) shows fair condition, with minor wear flagged for upkeep.
  • The substructure (piers and abutments) is in good condition (7/9), showing no significant deterioration.

How to read this record

This page shows what the last federal inspection recorded, not whether 79TH ST is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare 79TH ST against other structures in Marion and across Indiana. Indiana bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for 79TH ST?

79TH ST in Marion, Indiana has a deck rating of 6/9, superstructure rating of 6/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is 79TH ST inspected?

79TH ST's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 22,309 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. 79TH ST is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for 79TH ST?

79TH ST has an NBI inventory load rating of 28.8 metric tons.

Who is responsible for maintaining 79TH ST?

79TH ST is owned and maintained by City/Municipal Highway Agency.

How old is 79TH ST and does age affect safety?

79TH ST was built in 1966, making it 60 years old and last reconstructed in 1997.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.