FHWA NBI 2026 Inspection record Public-domain dataset

PLEASANT RUN PKWY

Carrying PLEASANT RUN PKWY over PLEASANT RUN

00.25 E OF EMERSON AVE, Marion, Indiana

FHWA NBI inspection record for this structure. Condition ratings, inventory load rating, span, deck width, and average daily traffic refresh annually with each NBI release.

Fair
33 t Inventory load rating

Bridge Snapshot: PLEASANT RUN PKWY

The PLEASANT RUN PKWY bridge in Marion, Indiana carries PLEASANT RUN PKWY over PLEASANT RUN. It was built in 1924, making it 102 years old today. The structure is built primarily of concrete and spans 1 section, stretching 16.5 meters (54 feet) end to end. Daily traffic averages 5,969 vehicles, placing it in the moderately-trafficked tier of Indiana bridges. It is owned and maintained by City/Municipal Highway Agency, the entity responsible for routine inspections and any needed repairs.

The latest FHWA inspection records show superstructure at 6/9, substructure at 6/9 on the 0–9 NBI scale, where 9 is excellent and 0 is failed. The weakest component sits in fair condition, which drives the overall status of this bridge. No major component scores in the poor range, so the bridge is not classified as structurally deficient under federal criteria. Its NBI inventory load rating is 32.7 metric tons — the load level the structure is rated to carry at inventory (long-term) level.

In a county that maintains hundreds of NBI-tracked bridges, PLEASANT RUN PKWY is one data point in a Indiana inventory that FHWA inspects on a two-year cycle (more often when ratings fall). Bridge age alone is not a reliable safety signal — a 102-era structure can outperform a newer one when maintenance is consistent, materials are sound, and traffic loads stay within design limits. Use the condition ratings above, the sufficiency score, and the structurally-deficient flag together to read the bridge's real status, and check the linked county and state pages to see how this bridge ranks against its peers.

Every figure on this page comes directly from the Federal Highway Administration National Bridge Inventory (NBI), the public dataset that catalogs more than 617,000 highway bridges across the United States and is updated annually from the records that each state Department of Transportation submits to the FHWA. The condition codes use the standardized FHWA Recording and Coding Guide, the same scale that determines federal eligibility for the Highway Bridge Program and the Surface Transportation Block Grant set-aside for off-system bridges. A "structurally deficient" classification under those federal criteria is a maintenance and funding flag, never a closure order; states keep deficient bridges open with load posting, weight limits, or accelerated inspection cycles until rehabilitation or replacement is funded. See our methodology for refresh cadence and the exact NBI release vintage powering each record.

How PLEASANT RUN PKWY compares

▼ 2.9
Load rating vs Indiana average (35.6 t)
Bottom 36%
Lower load rating than 64% of Indiana bridges
964
Bridges in Marion · 36 structurally deficient
PLEASANT RUN PKWY 32.7 t
Indiana average 35.6 t

NBI inventory load rating (metric tons) and structural-deficiency status compared across Indiana, computed live from the FHWA NBI.

Condition Ratings

Superstructure
6/9
Fair (5–6)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
32.7 t
NBI inventory level (metric tons)
SD Status
Not SD

Ratings are on a 0–9 scale: 9 = Excellent, 7–8 = Good, 5–6 = Fair, 3–4 = Poor, 0–2 = Critical/Failed. Sufficiency rating (0–100) combines structural adequacy, functional obsolescence, and essentiality.

Structural Details

Year Built
1924
Material
Concrete
Number of Spans
1
Structure Length
16.5 m (54 ft)
Deck Width
16.9 m (55 ft)
Owner
City/Municipal Highway Agency
Avg Daily Traffic
5,969 vehicles/day
Structure Number
4900249

Location

00.25 E OF EMERSON AVE, Marion, Indiana
39.775100, -86.078339
View on Google Maps ↗

Data Source

Data from the FHWA National Bridge Inventory (NBI). Bridge inspections are required every two years by federal law. Conditions reflect the most recent inspection.

FHWA NBI Program ↗

Condition Analysis

Built in 1924, this bridge is 102 years old. It carries approximately 5,969 vehicles per day. Based on the most recent FHWA inspection:

  • The superstructure (beams and supports above the deck) is in fair condition (6/9), with minor deterioration that may require routine maintenance.
  • The substructure (piers and abutments) is in fair condition (6/9), with minor deterioration that may require routine maintenance.

Its NBI inventory load rating reflects the load level it is rated to carry.

Frequently Asked Questions

What do the condition ratings mean for PLEASANT RUN PKWY?

Bridge condition ratings use a 0–9 scale set by the Federal Highway Administration (FHWA). Ratings 7–9 indicate good condition with no significant problems. Ratings 5–6 mean fair condition with minor issues. Ratings 3–4 indicate poor condition requiring repair. Ratings 0–2 are critical, meaning the bridge has serious structural problems. PLEASANT RUN PKWY in Marion, Indiana, superstructure rating of 6/9, and substructure rating of 6/9.

How often is PLEASANT RUN PKWY inspected?

Federal law requires most highway bridges to be inspected at least every 24 months. Bridges in poor condition or with known issues may be inspected more frequently (every 12 months or less). PLEASANT RUN PKWY is part of the National Bridge Inventory maintained by the FHWA. With 5,969 vehicles crossing daily, regular inspection is essential.

What does "structurally deficient" mean for a bridge?

A structurally deficient bridge has at least one major component (deck, superstructure, or substructure) rated 4 or below on the FHWA 0–9 scale. This classification does NOT mean the bridge is unsafe for travel — it means the bridge needs repair, rehabilitation, or eventual replacement. Structurally deficient bridges remain open and are monitored. PLEASANT RUN PKWY is not classified as structurally deficient.

What is the inventory load rating for PLEASANT RUN PKWY?

The NBI inventory rating is the load level a bridge is rated to carry for an indefinite period, recorded in metric tons. A lower number means the structure is more load-restricted. PLEASANT RUN PKWY has an inventory load rating of 32.7 metric tons. It is distinct from the FHWA sufficiency rating, a separate 0–100 funding-eligibility score that this dataset does not include.

Who is responsible for maintaining PLEASANT RUN PKWY?

Bridge ownership and maintenance responsibility varies — bridges may be owned by state DOTs, counties, cities, railroads, or federal agencies. PLEASANT RUN PKWY is maintained by City/Municipal Highway Agency. The FHWA oversees the National Bridge Inventory program and sets inspection standards, but day-to-day maintenance falls to the owning agency. If you notice damage or safety concerns, contact your state DOT or call 911 for emergencies.

How old is PLEASANT RUN PKWY and does age affect safety?

PLEASANT RUN PKWY was built in 1924, making it 102 years old. Bridge age alone does not determine safety — condition depends on materials, design, traffic load, maintenance history, and environmental exposure. Many older bridges remain in good condition due to regular maintenance and reconstruction.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A structurally deficient rating does not mean a bridge is closed or unsafe for travel — it indicates the bridge requires repair or replacement. For current closure or safety information, contact your state DOT.

Related

Data sourced from official U.S. government datasets. See our methodology for details. Retrieved and formatted by PlainBridges Editorial