FHWA NBI 2024 Inspection record Public-domain dataset

MORRIS ST

Carrying MORRIS ST over WHITE RIVER

00.25 E OF KENTUCKY AVE, Marion, Indiana

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Good
33 t Inventory load rating

Bridge Snapshot: MORRIS ST

The MORRIS ST bridge in Marion, Indiana carries MORRIS ST over WHITE RIVER. It was built in 1928, making it 98 years old today. It was last reconstructed in 2010, extending its service life. The structure is built primarily of concrete and spans 5 sections, stretching 199.1 meters (653 feet) end to end. Daily traffic averages 13,557 vehicles, placing it in the heavily-trafficked tier of Indiana bridges. It is owned and maintained by City/Municipal Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 7/9, substructure at 7/9. The weakest component sits in good condition. No reported major component scores in the Poor range under the current federal condition thresholds. Its NBI inventory load rating is 32.7 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How MORRIS ST compares

▼ 2.9
Load rating vs Indiana average (35.6 t)
Bottom 36%
Lower load rating than 64% of Indiana bridges
964
Bridges in Marion · 36 in Poor condition
MORRIS ST 32.7 t
Indiana average 35.6 t

Live comparison across Indiana.

Historical Sufficiency Rating

PlainBridge-computed
79.6 / 100 - historical 50–79.9 band
Structural adequacy /55
55.0
Serviceability /30
13.0
Essentiality /15
12.6
Special reductions
−1.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
7/9
Good (7–9)
Inventory Load Rating
32.7 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1928
Last Reconstructed
2010
Material
Concrete
Number of Spans
5
Structure Length
199.1 m (653 ft)
Deck Width
24.0 m (79 ft)
Owner
City/Municipal Highway Agency
Avg Daily Traffic
13,557 vehicles/day
Structure Number
4900296

Condition Analysis

  • The deck (driving surface) is in good condition (7/9), showing no significant deterioration.
  • The superstructure (beams and supports above the deck) is in good condition (7/9), showing no significant deterioration.
  • At 7/9, the substructure (piers and abutments) is in good shape and shows no significant wear.

How to read this record

This page shows what the last federal inspection recorded, not whether MORRIS ST is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare MORRIS ST against other structures in Marion and across Indiana. Indiana bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for MORRIS ST?

MORRIS ST in Marion, Indiana has a deck rating of 7/9, superstructure rating of 7/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is MORRIS ST inspected?

MORRIS ST's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 13,557 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. MORRIS ST is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for MORRIS ST?

MORRIS ST has an NBI inventory load rating of 32.7 metric tons.

Who is responsible for maintaining MORRIS ST?

MORRIS ST is owned and maintained by City/Municipal Highway Agency.

How old is MORRIS ST and does age affect safety?

MORRIS ST was built in 1928, making it 98 years old and last reconstructed in 2010.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.