FHWA NBI 2024 Inspection record Public-domain dataset

SR 40

Carrying SR 40 over BIG DARBY CREEK

1.98 MI N OF SR142, Madison, Ohio

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
32 t Inventory load rating

Bridge Snapshot: SR 40

The SR 40 bridge in Madison, Ohio carries SR 40 over BIG DARBY CREEK. It was built in 1940, making it 86 years old today. It was last reconstructed in 1984, extending its service life. The structure is built primarily of concrete and spans 2 sections, stretching 156.4 meters (513 feet) end to end. Daily traffic averages 9,659 vehicles, placing it in the moderately-trafficked tier of Ohio bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 5/9, substructure at 6/9. The weakest component sits in fair condition. All reported major components score above the Poor range. Its NBI inventory load rating is 32.4 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How SR 40 compares

▼ 5.1
Load rating vs Ohio average (37.5 t)
Bottom 26%
Lower load rating than 74% of Ohio bridges
198
Bridges in Madison · 17 in Poor condition
SR 40 32.4 t
Ohio average 37.5 t

Live comparison across Ohio.

Historical Sufficiency Rating

PlainBridge-computed
82.5 / 100 - historical 80–100 band
Structural adequacy /55
45.0
Serviceability /30
27.7
Essentiality /15
9.7
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
5/9
Fair (5–6)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
32.4 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1940
Last Reconstructed
1984
Material
Concrete
Number of Spans
2
Structure Length
156.4 m (513 ft)
Deck Width
19.5 m (64 ft)
Owner
State Highway Agency
Avg Daily Traffic
9,659 vehicles/day
Structure Number
4901029

Condition Analysis

  • At 7/9, the deck (driving surface) is in good shape and shows no significant wear.
  • The superstructure (beams and supports above the deck) rates fair at 5/9, minor deterioration that routine maintenance should address.
  • The substructure (piers and abutments) is in fair condition (6/9), with minor deterioration that may require routine maintenance.

How to read this record

This page shows what the last federal inspection recorded, not whether SR 40 is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare SR 40 against other structures in Madison and across Ohio. Ohio bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for SR 40?

SR 40 in Madison, Ohio has a deck rating of 7/9, superstructure rating of 5/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is SR 40 inspected?

SR 40's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 9,659 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. SR 40 is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for SR 40?

SR 40 has an NBI inventory load rating of 32.4 metric tons.

Who is responsible for maintaining SR 40?

SR 40 is owned and maintained by State Highway Agency.

How old is SR 40 and does age affect safety?

SR 40 was built in 1940, making it 86 years old and last reconstructed in 1984.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.