FHWA NBI 2024 Inspection record Public-domain dataset

TWISSELMAN ROAD

Carrying TWISSELMAN ROAD over CALIFORNIA AQUEDUCT

2.7 MI EAST HOLLOWAY ROAD, Kern, California

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Poor
36 t Inventory load rating

Bridge Snapshot: TWISSELMAN ROAD

The TWISSELMAN ROAD bridge in Kern, California carries TWISSELMAN ROAD over CALIFORNIA AQUEDUCT. It was built in 1965, making it 61 years old today. The structure is built primarily of concrete continuous and spans 3 sections, stretching 68.9 meters (226 feet) end to end. Daily traffic averages 800 vehicles, placing it in the lower-traffic tier of California bridges. It is owned and maintained by Other State Agencies.

The latest FHWA inspection records show a deck rating of 4/9, superstructure at 7/9, substructure at 5/9. The weakest component sits in poor condition. At least one major component here scores 4 or below, which produces a Poor condition classification under FHWA's current reporting rules. Its NBI inventory load rating is 35.6 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How TWISSELMAN ROAD compares

▲ 4.3
Load rating vs California average (31.3 t)
Top 19%
Higher load rating than 81% of California bridges
686
Bridges in Kern · 31 in Poor condition
TWISSELMAN ROAD 35.6 t
California average 31.3 t

Live comparison across California.

Historical Sufficiency Rating

PlainBridge-computed
75.4 / 100 - historical 50–79.9 band
Structural adequacy /55
45.0
Serviceability /30
16.9
Essentiality /15
14.5
Special reductions
−1.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
4/9
Poor (1–4)
Superstructure
7/9
Good (7–9)
Substructure
5/9
Fair (5–6)
Inventory Load Rating
35.6 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1965
Material
Concrete Continuous
Number of Spans
3
Structure Length
68.9 m (226 ft)
Deck Width
9.9 m (32 ft)
Owner
Other State Agencies
Avg Daily Traffic
800 vehicles/day
Structure Number
50C0205

Condition Analysis

  • At 4/9, the deck (driving surface) is in poor shape, with advanced wear flagged for priority repair.
  • The superstructure (beams and supports above the deck) is in good condition (7/9), showing no significant deterioration.
  • At 5/9, the substructure (piers and abutments) shows fair condition, with minor wear flagged for upkeep.

How to read this record

TWISSELMAN ROAD is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare TWISSELMAN ROAD against other structures in Kern and across California. California bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for TWISSELMAN ROAD?

TWISSELMAN ROAD in Kern, California has a deck rating of 4/9, superstructure rating of 7/9, and substructure rating of 5/9 on the FHWA's 0–9 scale.

How often is TWISSELMAN ROAD inspected?

TWISSELMAN ROAD's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 800 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. TWISSELMAN ROAD is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for TWISSELMAN ROAD?

TWISSELMAN ROAD has an NBI inventory load rating of 35.6 metric tons.

Who is responsible for maintaining TWISSELMAN ROAD?

TWISSELMAN ROAD is owned and maintained by Other State Agencies.

How old is TWISSELMAN ROAD and does age affect safety?

TWISSELMAN ROAD was built in 1965, making it 61 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.