FHWA NBI 2024 Inspection record Public-domain dataset

BLUE RIDGE PARKWAY

Carrying BLUE RIDGE PARKWAY over BRUSH CREEK

2.0 MILES FROM U.S. ROUTE, Alleghany, North Carolina

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Poor
23 t Inventory load rating

Bridge Snapshot: BLUE RIDGE PARKWAY

The BLUE RIDGE PARKWAY bridge in Alleghany, North Carolina carries BLUE RIDGE PARKWAY over BRUSH CREEK. It was built in 1936, making it 90 years old today. The structure is built primarily of concrete continuous and spans 2 sections, stretching 20.7 meters (68 feet) end to end. Daily traffic averages 1,347 vehicles, placing it in the moderately-trafficked tier of North Carolina bridges. It is owned and maintained by National Park Service.

The latest FHWA inspection records show a deck rating of 4/9, superstructure at 5/9, substructure at 6/9. The weakest component sits in poor condition. Because at least one major component scores 4 or lower, this bridge falls in FHWA's Poor condition category. That category is not a closure order. Its NBI inventory load rating is 22.7 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How BLUE RIDGE PARKWAY compares

▼ 21.5
Load rating vs North Carolina average (44.2 t)
Bottom 11%
Lower load rating than 89% of North Carolina bridges
117
Bridges in Alleghany · 13 in Poor condition
BLUE RIDGE PARKWAY 22.7 t
North Carolina average 44.2 t

Live comparison across North Carolina.

Historical Sufficiency Rating

PlainBridge-computed
65.3 / 100 - historical 50–79.9 band
Structural adequacy /55
35.2
Serviceability /30
20.0
Essentiality /15
11.1
Special reductions
−1.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
4/9
Poor (1–4)
Superstructure
5/9
Fair (5–6)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
22.7 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1936
Material
Concrete Continuous
Number of Spans
2
Structure Length
20.7 m (68 ft)
Deck Width
10.5 m (34 ft)
Owner
National Park Service
Avg Daily Traffic
1,347 vehicles/day
Structure Number
5140081P0000000

Condition Analysis

  • The deck (driving surface) is in poor condition (4/9), showing advanced deterioration that may require priority repair.
  • At 5/9, the superstructure (beams and supports above the deck) shows fair condition, with minor wear flagged for upkeep.
  • At 6/9, the substructure (piers and abutments) shows fair condition, with minor wear flagged for upkeep.

How to read this record

BLUE RIDGE PARKWAY is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare BLUE RIDGE PARKWAY against other structures in Alleghany and across North Carolina. North Carolina bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for BLUE RIDGE PARKWAY?

BLUE RIDGE PARKWAY in Alleghany, North Carolina has a deck rating of 4/9, superstructure rating of 5/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is BLUE RIDGE PARKWAY inspected?

BLUE RIDGE PARKWAY's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 1,347 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. BLUE RIDGE PARKWAY is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for BLUE RIDGE PARKWAY?

BLUE RIDGE PARKWAY has an NBI inventory load rating of 22.7 metric tons.

Who is responsible for maintaining BLUE RIDGE PARKWAY?

BLUE RIDGE PARKWAY is owned and maintained by National Park Service.

How old is BLUE RIDGE PARKWAY and does age affect safety?

BLUE RIDGE PARKWAY was built in 1936, making it 90 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.