N&S101-S110 CONNEC
Carrying N&S101-S110 CONNEC over TEMPLE STREET
07-LA-101-1.63-LA, Los Angeles, California
Data updated May 2026
FHWA NBI record, refreshed with each annual release.
Bridge Snapshot: N&S101-S110 CONNEC
The N&S101-S110 CONNEC bridge in Los Angeles, California carries N&S101-S110 CONNEC over TEMPLE STREET. It was built in 1948, making it 78 years old today. It was last reconstructed in 1996, extending its service life. The structure is built primarily of concrete and spans 1 section, stretching 29.6 meters (97 feet) end to end. Daily traffic averages 76,801 vehicles, placing it in the heavily-trafficked tier of California bridges. It is owned and maintained by State Highway Agency.
The latest FHWA inspection records show a deck rating of 5/9, superstructure at 7/9, substructure at 7/9. The weakest component sits in fair condition. No reported major component scores in the Poor range under the current federal condition thresholds. Its NBI inventory load rating is 35.6 metric tons.
Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.
How N&S101-S110 CONNEC compares
Live comparison across California.
Historical Sufficiency Rating
PlainBridge-computedFHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.
Condition Ratings
Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.
Structural Details
- Year Built
- 1948
- Last Reconstructed
- 1996
- Material
- Concrete
- Number of Spans
- 1
- Structure Length
- 29.6 m (97 ft)
- Deck Width
- 17.9 m (59 ft)
- Owner
- State Highway Agency
- Avg Daily Traffic
- 76,801 vehicles/day
- Structure Number
- 53 0240H
Location
Data Source
FHWA National Bridge Inventory (NBI).
FHWA NBI Program ↗Condition Analysis
- • At 5/9, the deck (driving surface) shows fair condition, with minor wear flagged for upkeep.
- • The superstructure (beams and supports above the deck) rates good at 7/9, with no significant deterioration on file.
- • At 7/9, the substructure (piers and abutments) is in good shape and shows no significant wear.
How to read this record
This page shows what the last federal inspection recorded, not whether N&S101-S110 CONNEC is safe to cross today. Here is how to use it.
- NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
- Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
- Compare N&S101-S110 CONNEC against other structures in Los Angeles and across California. California bridges
- Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge
Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.
Frequently Asked Questions
What do the condition ratings mean for N&S101-S110 CONNEC?
N&S101-S110 CONNEC in Los Angeles, California has a deck rating of 5/9, superstructure rating of 7/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.
How often is N&S101-S110 CONNEC inspected?
N&S101-S110 CONNEC's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 76,801 vehicles per day.
What does “structurally deficient” mean in older bridge reports?
FHWA retired that reported status beginning with the 2018 archive. N&S101-S110 CONNEC is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.
What is the inventory load rating for N&S101-S110 CONNEC?
N&S101-S110 CONNEC has an NBI inventory load rating of 35.6 metric tons.
Who is responsible for maintaining N&S101-S110 CONNEC?
N&S101-S110 CONNEC is owned and maintained by State Highway Agency.
How old is N&S101-S110 CONNEC and does age affect safety?
N&S101-S110 CONNEC was built in 1948, making it 78 years old and last reconstructed in 1996.
Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.
Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.