FHWA NBI 2024 Inspection record Public-domain dataset

TR 183 ENTSMINGER

Carrying TR 183 ENTSMINGER over LEADING CREEK

0.011 MILE W OF C10, Meigs, Ohio

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
16 t Inventory load rating

Bridge Snapshot: TR 183 ENTSMINGER

The TR 183 ENTSMINGER bridge in Meigs, Ohio carries TR 183 ENTSMINGER over LEADING CREEK. It was built in 1982, making it 44 years old today. The structure is built primarily of steel and spans 1 section, stretching 18.6 meters (61 feet) end to end. Daily traffic averages 20 vehicles, placing it in the lower-traffic tier of Ohio bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 7/9, substructure at 6/9. The weakest component sits in fair condition. None of this bridge's reported major components fall into the Poor condition range. Its NBI inventory load rating is 16.2 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How TR 183 ENTSMINGER compares

▼ 21.3
Load rating vs Ohio average (37.5 t)
Bottom 3%
Lower load rating than 97% of Ohio bridges
207
Bridges in Meigs · 6 in Poor condition
TR 183 ENTSMINGER 16.2 t
Ohio average 37.5 t

Live comparison across Ohio.

Historical Sufficiency Rating

PlainBridge-computed
49.4 / 100 - historical 20–49.9 band
Structural adequacy /55
33.8
Serviceability /30
12.0
Essentiality /15
14.7
Special reductions
−11.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
16.2 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1982
Material
Steel
Number of Spans
1
Structure Length
18.6 m (61 ft)
Deck Width
4.3 m (14 ft)
Owner
County Highway Agency
Avg Daily Traffic
20 vehicles/day
Structure Number
5338522

Condition Analysis

  • At 7/9, the deck (driving surface) is in good shape and shows no significant wear.
  • The superstructure (beams and supports above the deck) is in good condition (7/9), showing no significant deterioration.
  • The substructure (piers and abutments) rates fair at 6/9, minor deterioration that routine maintenance should address.

How to read this record

This page shows what the last federal inspection recorded, not whether TR 183 ENTSMINGER is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare TR 183 ENTSMINGER against other structures in Meigs and across Ohio. Ohio bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for TR 183 ENTSMINGER?

TR 183 ENTSMINGER in Meigs, Ohio has a deck rating of 7/9, superstructure rating of 7/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is TR 183 ENTSMINGER inspected?

TR 183 ENTSMINGER's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 20 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. TR 183 ENTSMINGER is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for TR 183 ENTSMINGER?

TR 183 ENTSMINGER has an NBI inventory load rating of 16.2 metric tons.

Who is responsible for maintaining TR 183 ENTSMINGER?

TR 183 ENTSMINGER is owned and maintained by County Highway Agency.

How old is TR 183 ENTSMINGER and does age affect safety?

TR 183 ENTSMINGER was built in 1982, making it 44 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.