FHWA NBI 2024 Inspection record Public-domain dataset

THE TOLEDO, W

Carrying THE TOLEDO, W over RIVO ALTO CANAL

0.2MI W/O RAVENNA DR, Los Angeles, California

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
12 t Inventory load rating

Bridge Snapshot: THE TOLEDO, W

The THE TOLEDO, W bridge in Los Angeles, California carries THE TOLEDO, W over RIVO ALTO CANAL. It was built in 1967, making it 59 years old today. The structure is built primarily of concrete and spans 1 section, stretching 23.2 meters (76 feet) end to end. Daily traffic averages 1,836 vehicles, placing it in the moderately-trafficked tier of California bridges. It is owned and maintained by City/Municipal Highway Agency.

The latest FHWA inspection records show a deck rating of 5/9, superstructure at 7/9, substructure at 7/9. The weakest component sits in fair condition. All reported major components score above the Poor range. Its NBI inventory load rating is 12.0 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How THE TOLEDO, W compares

▼ 19.3
Load rating vs California average (31.3 t)
Bottom 1%
Lower load rating than 99% of California bridges
3,937
Bridges in Los Angeles · 88 in Poor condition
THE TOLEDO, W 12.0 t
California average 31.3 t

Live comparison across California.

Historical Sufficiency Rating

PlainBridge-computed
47.6 / 100 - historical 20–49.9 band
Structural adequacy /55
25.0
Serviceability /30
8.0
Essentiality /15
14.6
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
5/9
Fair (5–6)
Superstructure
7/9
Good (7–9)
Substructure
7/9
Good (7–9)
Inventory Load Rating
12.0 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1967
Material
Concrete
Number of Spans
1
Structure Length
23.2 m (76 ft)
Deck Width
10.4 m (34 ft)
Owner
City/Municipal Highway Agency
Avg Daily Traffic
1,836 vehicles/day
Structure Number
53C0023

Condition Analysis

  • The deck (driving surface) rates fair at 5/9, minor deterioration that routine maintenance should address.
  • At 7/9, the superstructure (beams and supports above the deck) is in good shape and shows no significant wear.
  • The substructure (piers and abutments) is in good condition (7/9), showing no significant deterioration.

How to read this record

This page shows what the last federal inspection recorded, not whether THE TOLEDO, W is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare THE TOLEDO, W against other structures in Los Angeles and across California. California bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for THE TOLEDO, W?

THE TOLEDO, W in Los Angeles, California has a deck rating of 5/9, superstructure rating of 7/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is THE TOLEDO, W inspected?

THE TOLEDO, W's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 1,836 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. THE TOLEDO, W is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for THE TOLEDO, W?

THE TOLEDO, W has an NBI inventory load rating of 12.0 metric tons.

Who is responsible for maintaining THE TOLEDO, W?

THE TOLEDO, W is owned and maintained by City/Municipal Highway Agency.

How old is THE TOLEDO, W and does age affect safety?

THE TOLEDO, W was built in 1967, making it 59 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.