FHWA NBI 2024 Inspection record Public-domain dataset

CIRCLE TRAIL

Carrying CIRCLE TRAIL over TOPANGA CYN CRK

25FT W/O TOPANGA CYN BLVD, Los Angeles, California

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Poor
6 t Inventory load rating

Bridge Snapshot: CIRCLE TRAIL

The CIRCLE TRAIL bridge in Los Angeles, California carries CIRCLE TRAIL over TOPANGA CYN CRK. It was built in 1936, making it 90 years old today. It was last reconstructed in 1966, extending its service life. The structure is built primarily of steel and spans 1 section, stretching 12.5 meters (41 feet) end to end. Daily traffic averages 204 vehicles, placing it in the lower-traffic tier of California bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 5/9, substructure at 3/9. The weakest component sits in poor condition. Because at least one major component scores 4 or lower, this bridge falls in FHWA's Poor condition category. That category is not a closure order. Its NBI inventory load rating is 6.2 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How CIRCLE TRAIL compares

▼ 25.1
Load rating vs California average (31.3 t)
Bottom 1%
Lower load rating than 99% of California bridges
3,937
Bridges in Los Angeles · 88 in Poor condition
CIRCLE TRAIL 6.2 t
California average 31.3 t

Live comparison across California.

Historical Sufficiency Rating

PlainBridge-computed
28.3 / 100 - historical 20–49.9 band
Structural adequacy /55
0.0
Serviceability /30
21.0
Essentiality /15
7.3
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
5/9
Fair (5–6)
Substructure
3/9
Poor (1–4)
Inventory Load Rating
6.2 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1936
Last Reconstructed
1966
Material
Steel
Number of Spans
1
Structure Length
12.5 m (41 ft)
Deck Width
8.6 m (28 ft)
Owner
County Highway Agency
Avg Daily Traffic
204 vehicles/day
Structure Number
53C0970

Condition Analysis

  • At 7/9, the deck (driving surface) is in good shape and shows no significant wear.
  • The superstructure (beams and supports above the deck) is in fair condition (5/9), with minor deterioration that may require routine maintenance.
  • The substructure (piers and abutments) rates poor at 3/9, advanced deterioration that should be prioritized for repair.

How to read this record

CIRCLE TRAIL is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare CIRCLE TRAIL against other structures in Los Angeles and across California. California bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for CIRCLE TRAIL?

CIRCLE TRAIL in Los Angeles, California has a deck rating of 7/9, superstructure rating of 5/9, and substructure rating of 3/9 on the FHWA's 0–9 scale.

How often is CIRCLE TRAIL inspected?

CIRCLE TRAIL's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 204 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. CIRCLE TRAIL is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for CIRCLE TRAIL?

CIRCLE TRAIL has an NBI inventory load rating of 6.2 metric tons.

Who is responsible for maintaining CIRCLE TRAIL?

CIRCLE TRAIL is owned and maintained by County Highway Agency.

How old is CIRCLE TRAIL and does age affect safety?

CIRCLE TRAIL was built in 1936, making it 90 years old and last reconstructed in 1966.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.