FHWA NBI 2024 Inspection record Public-domain dataset

PARRIOT PL

Carrying PARRIOT PL over SAN JOSE CRK

100FT W/O HACIENDA BLVD, Los Angeles, California

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Poor
41 t Inventory load rating

Bridge Snapshot: PARRIOT PL

The PARRIOT PL bridge in Los Angeles, California carries PARRIOT PL over SAN JOSE CRK. It was built in 1964, making it 62 years old today. The structure is built primarily of prestressed concrete and spans 1 section, stretching 27.1 meters (89 feet) end to end. Daily traffic averages 2,244 vehicles, placing it in the moderately-trafficked tier of California bridges. It is owned and maintained by City/Municipal Highway Agency.

The latest FHWA inspection records show a deck rating of 4/9, superstructure at 7/9, substructure at 7/9. The weakest component sits in poor condition. At least one major component here scores 4 or below, which produces a Poor condition classification under FHWA's current reporting rules. Its NBI inventory load rating is 41.1 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How PARRIOT PL compares

▲ 9.8
Load rating vs California average (31.3 t)
Top 12%
Higher load rating than 88% of California bridges
3,937
Bridges in Los Angeles · 88 in Poor condition
PARRIOT PL 41.1 t
California average 31.3 t

Live comparison across California.

Historical Sufficiency Rating

PlainBridge-computed
81.0 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
14.2
Essentiality /15
14.7
Special reductions
−3.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
4/9
Poor (1–4)
Superstructure
7/9
Good (7–9)
Substructure
7/9
Good (7–9)
Inventory Load Rating
41.1 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1964
Material
Prestressed Concrete
Number of Spans
1
Structure Length
27.1 m (89 ft)
Deck Width
11.0 m (36 ft)
Owner
City/Municipal Highway Agency
Avg Daily Traffic
2,244 vehicles/day
Structure Number
53C1470

Condition Analysis

  • At 4/9, the deck (driving surface) is in poor shape, with advanced wear flagged for priority repair.
  • At 7/9, the superstructure (beams and supports above the deck) is in good shape and shows no significant wear.
  • The substructure (piers and abutments) is in good condition (7/9), showing no significant deterioration.

How to read this record

PARRIOT PL is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare PARRIOT PL against other structures in Los Angeles and across California. California bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for PARRIOT PL?

PARRIOT PL in Los Angeles, California has a deck rating of 4/9, superstructure rating of 7/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is PARRIOT PL inspected?

PARRIOT PL's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 2,244 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. PARRIOT PL is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for PARRIOT PL?

PARRIOT PL has an NBI inventory load rating of 41.1 metric tons.

Who is responsible for maintaining PARRIOT PL?

PARRIOT PL is owned and maintained by City/Municipal Highway Agency.

How old is PARRIOT PL and does age affect safety?

PARRIOT PL was built in 1964, making it 62 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.