CR 259
Carrying CR 259 over SCL Railroad
3.5 Mi West of US19/SR57, Jefferson, Florida
Data updated May 2026
FHWA NBI record, refreshed with each annual release.
Bridge Snapshot: CR 259
The CR 259 bridge in Jefferson, Florida carries CR 259 over SCL Railroad. It was built in 1977, making it 49 years old today. The structure is built primarily of prestressed concrete and spans 3 sections, stretching 55.3 meters (181 feet) end to end. Daily traffic averages 1,600 vehicles, placing it in the moderately-trafficked tier of Florida bridges. It is owned and maintained by County Highway Agency.
The latest FHWA inspection records show a deck rating of 3/9, superstructure at 7/9, substructure at 7/9. The weakest component sits in poor condition. Because at least one major component scores 4 or lower, this bridge falls in FHWA's Poor condition category. That category is not a closure order. Its NBI inventory load rating is 42.6 metric tons.
Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.
How CR 259 compares
Live comparison across Florida.
Historical Sufficiency Rating
PlainBridge-computedFHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.
Condition Ratings
Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.
Structural Details
- Year Built
- 1977
- Material
- Prestressed Concrete
- Number of Spans
- 3
- Structure Length
- 55.3 m (181 ft)
- Deck Width
- 14.1 m (46 ft)
- Owner
- County Highway Agency
- Avg Daily Traffic
- 1,600 vehicles/day
- Structure Number
- 540062
Location
Data Source
FHWA National Bridge Inventory (NBI).
FHWA NBI Program ↗Condition Analysis
- • The deck (driving surface) is in poor condition (3/9), showing advanced deterioration that may require priority repair.
- • The superstructure (beams and supports above the deck) rates good at 7/9, with no significant deterioration on file.
- • The substructure (piers and abutments) is in good condition (7/9), showing no significant deterioration.
How to read this record
CR 259 is in the federal Poor condition category. That is a component-based result, not a closure order.
- NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
- Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
- Compare CR 259 against other structures in Jefferson and across Florida. Florida bridges
- Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge
Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.
Frequently Asked Questions
What do the condition ratings mean for CR 259?
CR 259 in Jefferson, Florida has a deck rating of 3/9, superstructure rating of 7/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.
How often is CR 259 inspected?
CR 259's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 1,600 vehicles per day.
What does “structurally deficient” mean in older bridge reports?
FHWA retired that reported status beginning with the 2018 archive. CR 259 is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.
What is the inventory load rating for CR 259?
CR 259 has an NBI inventory load rating of 42.6 metric tons.
Who is responsible for maintaining CR 259?
CR 259 is owned and maintained by County Highway Agency.
How old is CR 259 and does age affect safety?
CR 259 was built in 1977, making it 49 years old.
Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.
Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.