FHWA NBI 2024 Inspection record Public-domain dataset

CAMPGROUND ENTRANC

Carrying CAMPGROUND ENTRANC over OCONALUFTEE RIVER

AT ENTRANCE TO SMOKEMONT, Swain, North Carolina

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
22 t Inventory load rating

Bridge Snapshot: CAMPGROUND ENTRANC

The CAMPGROUND ENTRANC bridge in Swain, North Carolina carries CAMPGROUND ENTRANC over OCONALUFTEE RIVER. It was built in 1998, making it 28 years old today. The structure is built primarily of prestressed concrete and spans 1 section, stretching 30.5 meters (100 feet) end to end. Daily traffic averages 1,714 vehicles, placing it in the moderately-trafficked tier of North Carolina bridges. It is owned and maintained by National Park Service.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 6/9, substructure at 7/9. The weakest component sits in fair condition. All reported major components score above the Poor range. Its NBI inventory load rating is 21.8 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How CAMPGROUND ENTRANC compares

▼ 22.4
Load rating vs North Carolina average (44.2 t)
Bottom 10%
Lower load rating than 90% of North Carolina bridges
129
Bridges in Swain · 15 in Poor condition
CAMPGROUND ENTRANC 21.8 t
North Carolina average 44.2 t

Live comparison across North Carolina.

Historical Sufficiency Rating

PlainBridge-computed
48.8 / 100 - historical 20–49.9 band
Structural adequacy /55
43.8
Serviceability /30
10.0
Essentiality /15
0.0
Special reductions
−5.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
6/9
Fair (5–6)
Substructure
7/9
Good (7–9)
Inventory Load Rating
21.8 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1998
Material
Prestressed Concrete
Number of Spans
1
Structure Length
30.5 m (100 ft)
Deck Width
8.6 m (28 ft)
Owner
National Park Service
Avg Daily Traffic
1,714 vehicles/day
Structure Number
5460096P0000000

Condition Analysis

  • At 7/9, the deck (driving surface) is in good shape and shows no significant wear.
  • The superstructure (beams and supports above the deck) rates fair at 6/9, minor deterioration that routine maintenance should address.
  • The substructure (piers and abutments) rates good at 7/9, with no significant deterioration on file.

How to read this record

This page shows what the last federal inspection recorded, not whether CAMPGROUND ENTRANC is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare CAMPGROUND ENTRANC against other structures in Swain and across North Carolina. North Carolina bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for CAMPGROUND ENTRANC?

CAMPGROUND ENTRANC in Swain, North Carolina has a deck rating of 7/9, superstructure rating of 6/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is CAMPGROUND ENTRANC inspected?

CAMPGROUND ENTRANC's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 1,714 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. CAMPGROUND ENTRANC is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for CAMPGROUND ENTRANC?

CAMPGROUND ENTRANC has an NBI inventory load rating of 21.8 metric tons.

Who is responsible for maintaining CAMPGROUND ENTRANC?

CAMPGROUND ENTRANC is owned and maintained by National Park Service.

How old is CAMPGROUND ENTRANC and does age affect safety?

CAMPGROUND ENTRANC was built in 1998, making it 28 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.