FHWA NBI 2024 Inspection record Public-domain dataset

PARK MOABI RD

Carrying PARK MOABI RD over BNSF RY & AMTRAK

100' N OF RTE I-40, San Bernardino, California

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Good
31 t Inventory load rating

Bridge Snapshot: PARK MOABI RD

The PARK MOABI RD bridge in San Bernardino, California carries PARK MOABI RD over BNSF RY & AMTRAK. It was built in 1966, making it 60 years old today. The structure is built primarily of steel continuous and spans 3 sections, stretching 50.6 meters (166 feet) end to end. Daily traffic averages 522 vehicles, placing it in the lower-traffic tier of California bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 7/9, substructure at 7/9. The weakest component sits in good condition. No reported major component scores in the Poor range under the current federal condition thresholds. Its NBI inventory load rating is 30.5 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How PARK MOABI RD compares

▼ 0.8
Load rating vs California average (31.3 t)
Bottom 38%
Lower load rating than 62% of California bridges
1,465
Bridges in San Bernardino · 80 in Poor condition
PARK MOABI RD 30.5 t
California average 31.3 t

Live comparison across California.

Historical Sufficiency Rating

PlainBridge-computed
87.2 / 100 - historical 80–100 band
Structural adequacy /55
54.1
Serviceability /30
30.0
Essentiality /15
10.1
Special reductions
−7.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
7/9
Good (7–9)
Inventory Load Rating
30.5 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1966
Material
Steel Continuous
Number of Spans
3
Structure Length
50.6 m (166 ft)
Deck Width
13.0 m (43 ft)
Owner
County Highway Agency
Avg Daily Traffic
522 vehicles/day
Structure Number
54C0094

Condition Analysis

  • The deck (driving surface) rates good at 7/9, with no significant deterioration on file.
  • The superstructure (beams and supports above the deck) rates good at 7/9, with no significant deterioration on file.
  • The substructure (piers and abutments) is in good condition (7/9), showing no significant deterioration.

How to read this record

This page shows what the last federal inspection recorded, not whether PARK MOABI RD is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare PARK MOABI RD against other structures in San Bernardino and across California. California bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for PARK MOABI RD?

PARK MOABI RD in San Bernardino, California has a deck rating of 7/9, superstructure rating of 7/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is PARK MOABI RD inspected?

PARK MOABI RD's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 522 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. PARK MOABI RD is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for PARK MOABI RD?

PARK MOABI RD has an NBI inventory load rating of 30.5 metric tons.

Who is responsible for maintaining PARK MOABI RD?

PARK MOABI RD is owned and maintained by County Highway Agency.

How old is PARK MOABI RD and does age affect safety?

PARK MOABI RD was built in 1966, making it 60 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.