FHWA NBI 2024 Inspection record Public-domain dataset

MISSION BLVD W BND

Carrying MISSION BLVD W BND over CUCAMONGA CREEK CHANNEL

0.4 MI W ARCHIBALD AVE, San Bernardino, California

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Good
32 t Inventory load rating

Bridge Snapshot: MISSION BLVD W BND

The MISSION BLVD W BND bridge in San Bernardino, California carries MISSION BLVD W BND over CUCAMONGA CREEK CHANNEL. It was built in 1979, making it 47 years old today. The structure is built primarily of prestressed concrete and spans 1 section, stretching 25.0 meters (82 feet) end to end. Daily traffic averages 12,082 vehicles, placing it in the heavily-trafficked tier of California bridges. It is owned and maintained by City/Municipal Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 7/9, substructure at 7/9. The weakest component sits in good condition. All reported major components score above the Poor range. Its NBI inventory load rating is 32.4 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How MISSION BLVD W BND compares

▲ 1.1
Load rating vs California average (31.3 t)
Bottom 41%
Lower load rating than 59% of California bridges
1,465
Bridges in San Bernardino · 80 in Poor condition
MISSION BLVD W BND 32.4 t
California average 31.3 t

Live comparison across California.

Historical Sufficiency Rating

PlainBridge-computed
76.5 / 100 - historical 50–79.9 band
Structural adequacy /55
55.0
Serviceability /30
11.0
Essentiality /15
13.5
Special reductions
−3.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
7/9
Good (7–9)
Inventory Load Rating
32.4 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1979
Material
Prestressed Concrete
Number of Spans
1
Structure Length
25.0 m (82 ft)
Deck Width
9.8 m (32 ft)
Owner
City/Municipal Highway Agency
Avg Daily Traffic
12,082 vehicles/day
Structure Number
54C0525L

Condition Analysis

  • The deck (driving surface) rates good at 7/9, with no significant deterioration on file.
  • The superstructure (beams and supports above the deck) rates good at 7/9, with no significant deterioration on file.
  • At 7/9, the substructure (piers and abutments) is in good shape and shows no significant wear.

How to read this record

This page shows what the last federal inspection recorded, not whether MISSION BLVD W BND is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare MISSION BLVD W BND against other structures in San Bernardino and across California. California bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for MISSION BLVD W BND?

MISSION BLVD W BND in San Bernardino, California has a deck rating of 7/9, superstructure rating of 7/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is MISSION BLVD W BND inspected?

MISSION BLVD W BND's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 12,082 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. MISSION BLVD W BND is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for MISSION BLVD W BND?

MISSION BLVD W BND has an NBI inventory load rating of 32.4 metric tons.

Who is responsible for maintaining MISSION BLVD W BND?

MISSION BLVD W BND is owned and maintained by City/Municipal Highway Agency.

How old is MISSION BLVD W BND and does age affect safety?

MISSION BLVD W BND was built in 1979, making it 47 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.