FHWA NBI 2024 Inspection record Public-domain dataset

CR81 COVINGTON-GET

Carrying CR81 COVINGTON-GET over GREENVILLE CREEK

0.10 MI W OF TR85, Miami, Ohio

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Good
64 t Inventory load rating

Bridge Snapshot: CR81 COVINGTON-GET

The CR81 COVINGTON-GET bridge in Miami, Ohio carries CR81 COVINGTON-GET over GREENVILLE CREEK. It was built in 2013, making it 13 years old today. The structure is built primarily of prestressed concrete and spans 1 section, stretching 34.4 meters (113 feet) end to end. Daily traffic averages 427 vehicles, placing it in the lower-traffic tier of Ohio bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 9/9, superstructure at 9/9, substructure at 9/9. The weakest component sits in good condition. No reported major component scores in the Poor range under the current federal condition thresholds. Its NBI inventory load rating is 63.8 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How CR81 COVINGTON-GET compares

▲ 26.3
Load rating vs Ohio average (37.5 t)
Top 6%
Higher load rating than 94% of Ohio bridges
315
Bridges in Miami · 22 in Poor condition
CR81 COVINGTON-GET 63.8 t
Ohio average 37.5 t

Live comparison across Ohio.

Historical Sufficiency Rating

PlainBridge-computed
95.6 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
25.7
Essentiality /15
14.9
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
9/9
Good (7–9)
Superstructure
9/9
Good (7–9)
Substructure
9/9
Good (7–9)
Inventory Load Rating
63.8 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
2013
Material
Prestressed Concrete
Number of Spans
1
Structure Length
34.4 m (113 ft)
Deck Width
9.8 m (32 ft)
Owner
County Highway Agency
Avg Daily Traffic
427 vehicles/day
Structure Number
5533481

Condition Analysis

  • At 9/9, the deck (driving surface) is in good shape and shows no significant wear.
  • The superstructure (beams and supports above the deck) is in good condition (9/9), showing no significant deterioration.
  • At 9/9, the substructure (piers and abutments) is in good shape and shows no significant wear.

How to read this record

This page shows what the last federal inspection recorded, not whether CR81 COVINGTON-GET is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare CR81 COVINGTON-GET against other structures in Miami and across Ohio. Ohio bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for CR81 COVINGTON-GET?

CR81 COVINGTON-GET in Miami, Ohio has a deck rating of 9/9, superstructure rating of 9/9, and substructure rating of 9/9 on the FHWA's 0–9 scale.

How often is CR81 COVINGTON-GET inspected?

CR81 COVINGTON-GET's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 427 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. CR81 COVINGTON-GET is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for CR81 COVINGTON-GET?

CR81 COVINGTON-GET has an NBI inventory load rating of 63.8 metric tons.

Who is responsible for maintaining CR81 COVINGTON-GET?

CR81 COVINGTON-GET is owned and maintained by County Highway Agency.

How old is CR81 COVINGTON-GET and does age affect safety?

CR81 COVINGTON-GET was built in 2013, making it 13 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.